Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model

Karst is an unfavorable geology that is very undesirable in tunnel construction. It is extremely risky due to the complexity and fuzziness of shield excavation in karst strata. To reduce the construction risk of shield tunneling in karst strata, a risk assessment method based on cloud model and fuzz...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Guowang Meng, Yangchun Ye, Bo Wu, Guijun Luo, Xu Zhang, Zhiqiang Zhou, Wentao Sun
Formato: article
Lenguaje:EN
Publicado: Hindawi Limited 2021
Materias:
Acceso en línea:https://doaj.org/article/8e53bfa74d214757881de56a782c45a7
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:8e53bfa74d214757881de56a782c45a7
record_format dspace
spelling oai:doaj.org-article:8e53bfa74d214757881de56a782c45a72021-11-15T01:19:37ZRisk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model1875-920310.1155/2021/7237136https://doaj.org/article/8e53bfa74d214757881de56a782c45a72021-01-01T00:00:00Zhttp://dx.doi.org/10.1155/2021/7237136https://doaj.org/toc/1875-9203Karst is an unfavorable geology that is very undesirable in tunnel construction. It is extremely risky due to the complexity and fuzziness of shield excavation in karst strata. To reduce the construction risk of shield tunneling in karst strata, a risk assessment method based on cloud model and fuzzy analytic hierarchy process (FAHP) is proposed. A risk assessment index system is established, including four first-level indices of karst geological conditions, hydrogeological conditions, tunnel design, and shield construction, as well as seventeen second-level indices. Fuzzy analytic hierarchy process is used to determine the evaluation indices weights. The numerical characteristics of each index and the risk cloud diagram are obtained via the backward cloud generator and forward cloud generator, respectively. The certainty degrees of the assessment indices corresponding to each risk level are calculated, and the final risk level is determined based on the comparison of the risk cloud diagram and the principle of maximum certainty. The proposed model is applied to the risk analysis and calculation of shield tunnel engineering, and the risk assessment results indicate that the comprehensive risk level of shield tunnel construction in karst strata is level II, which is consistent with the actual project. It demonstrates that the proposed method can provide a reference for the risk assessment of shield tunnels construction in karst strata.Guowang MengYangchun YeBo WuGuijun LuoXu ZhangZhiqiang ZhouWentao SunHindawi LimitedarticlePhysicsQC1-999ENShock and Vibration, Vol 2021 (2021)
institution DOAJ
collection DOAJ
language EN
topic Physics
QC1-999
spellingShingle Physics
QC1-999
Guowang Meng
Yangchun Ye
Bo Wu
Guijun Luo
Xu Zhang
Zhiqiang Zhou
Wentao Sun
Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
description Karst is an unfavorable geology that is very undesirable in tunnel construction. It is extremely risky due to the complexity and fuzziness of shield excavation in karst strata. To reduce the construction risk of shield tunneling in karst strata, a risk assessment method based on cloud model and fuzzy analytic hierarchy process (FAHP) is proposed. A risk assessment index system is established, including four first-level indices of karst geological conditions, hydrogeological conditions, tunnel design, and shield construction, as well as seventeen second-level indices. Fuzzy analytic hierarchy process is used to determine the evaluation indices weights. The numerical characteristics of each index and the risk cloud diagram are obtained via the backward cloud generator and forward cloud generator, respectively. The certainty degrees of the assessment indices corresponding to each risk level are calculated, and the final risk level is determined based on the comparison of the risk cloud diagram and the principle of maximum certainty. The proposed model is applied to the risk analysis and calculation of shield tunnel engineering, and the risk assessment results indicate that the comprehensive risk level of shield tunnel construction in karst strata is level II, which is consistent with the actual project. It demonstrates that the proposed method can provide a reference for the risk assessment of shield tunnels construction in karst strata.
format article
author Guowang Meng
Yangchun Ye
Bo Wu
Guijun Luo
Xu Zhang
Zhiqiang Zhou
Wentao Sun
author_facet Guowang Meng
Yangchun Ye
Bo Wu
Guijun Luo
Xu Zhang
Zhiqiang Zhou
Wentao Sun
author_sort Guowang Meng
title Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
title_short Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
title_full Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
title_fullStr Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
title_full_unstemmed Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
title_sort risk assessment of shield tunnel construction in karst strata based on fuzzy analytic hierarchy process and cloud model
publisher Hindawi Limited
publishDate 2021
url https://doaj.org/article/8e53bfa74d214757881de56a782c45a7
work_keys_str_mv AT guowangmeng riskassessmentofshieldtunnelconstructioninkarststratabasedonfuzzyanalytichierarchyprocessandcloudmodel
AT yangchunye riskassessmentofshieldtunnelconstructioninkarststratabasedonfuzzyanalytichierarchyprocessandcloudmodel
AT bowu riskassessmentofshieldtunnelconstructioninkarststratabasedonfuzzyanalytichierarchyprocessandcloudmodel
AT guijunluo riskassessmentofshieldtunnelconstructioninkarststratabasedonfuzzyanalytichierarchyprocessandcloudmodel
AT xuzhang riskassessmentofshieldtunnelconstructioninkarststratabasedonfuzzyanalytichierarchyprocessandcloudmodel
AT zhiqiangzhou riskassessmentofshieldtunnelconstructioninkarststratabasedonfuzzyanalytichierarchyprocessandcloudmodel
AT wentaosun riskassessmentofshieldtunnelconstructioninkarststratabasedonfuzzyanalytichierarchyprocessandcloudmodel
_version_ 1718428935439515648