Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt

There are three main criteria that account for a construction project’s success: completion on-time, within budget, and following the specifications. Nowadays, construction projects are facing various problems where delays are considered major one of them, particularly in Egypt. Analyzing constructi...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Hayssam O. Elhusseiny, Ibrahim Nosair, A. Samer Ezeldin
Formato: article
Lenguaje:EN
Publicado: Elsevier 2021
Materias:
Acceso en línea:https://doaj.org/article/8f2a2aaea41c4e3184856a7a1ec7ff97
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:8f2a2aaea41c4e3184856a7a1ec7ff97
record_format dspace
spelling oai:doaj.org-article:8f2a2aaea41c4e3184856a7a1ec7ff972021-11-22T04:22:00ZDeveloping a user plug-in to assess delay causes’ impact on construction projects in Egypt2090-447910.1016/j.asej.2021.04.013https://doaj.org/article/8f2a2aaea41c4e3184856a7a1ec7ff972021-12-01T00:00:00Zhttp://www.sciencedirect.com/science/article/pii/S2090447921001908https://doaj.org/toc/2090-4479There are three main criteria that account for a construction project’s success: completion on-time, within budget, and following the specifications. Nowadays, construction projects are facing various problems where delays are considered major one of them, particularly in Egypt. Analyzing construction delay causes while attempting to mitigate their impact is a matter of crucial importance. That’s why a program was developed to help the user assess the delay causes’ impact with respect to the project’s concerned activities. Besides, it was designed to identify the potential mitigation measures according to the delay cause type. The Building Information Modeling (BIM) was the platform used to carry out such analysis. Thus, the main objective of this study is to investigate the delay causes’ effect on the project’s duration and cost. This was achieved by analyzing the concerned activities’ affected duration and cost, according to the selected delay cause and its associated mitigation measures, by means of a developed user plug-in. Then, duration/cost summary tables were presented for the user to highlight the main findings in terms of delay and saving impact. The attained results were considered important indicators to be referred to for similar cases throughout the project progress. Apart from being a helpful tool for assessing construction delay causes’ impact, this developed user plug-in could also serve in future research works associated to this subject.Hayssam O. ElhusseinyIbrahim NosairA. Samer EzeldinElsevierarticleConstruction Projects’ DelaysUser Plug-inBuilding Information Modeling (BIM)MitigationEngineering (General). Civil engineering (General)TA1-2040ENAin Shams Engineering Journal, Vol 12, Iss 4, Pp 3553-3568 (2021)
institution DOAJ
collection DOAJ
language EN
topic Construction Projects’ Delays
User Plug-in
Building Information Modeling (BIM)
Mitigation
Engineering (General). Civil engineering (General)
TA1-2040
spellingShingle Construction Projects’ Delays
User Plug-in
Building Information Modeling (BIM)
Mitigation
Engineering (General). Civil engineering (General)
TA1-2040
Hayssam O. Elhusseiny
Ibrahim Nosair
A. Samer Ezeldin
Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt
description There are three main criteria that account for a construction project’s success: completion on-time, within budget, and following the specifications. Nowadays, construction projects are facing various problems where delays are considered major one of them, particularly in Egypt. Analyzing construction delay causes while attempting to mitigate their impact is a matter of crucial importance. That’s why a program was developed to help the user assess the delay causes’ impact with respect to the project’s concerned activities. Besides, it was designed to identify the potential mitigation measures according to the delay cause type. The Building Information Modeling (BIM) was the platform used to carry out such analysis. Thus, the main objective of this study is to investigate the delay causes’ effect on the project’s duration and cost. This was achieved by analyzing the concerned activities’ affected duration and cost, according to the selected delay cause and its associated mitigation measures, by means of a developed user plug-in. Then, duration/cost summary tables were presented for the user to highlight the main findings in terms of delay and saving impact. The attained results were considered important indicators to be referred to for similar cases throughout the project progress. Apart from being a helpful tool for assessing construction delay causes’ impact, this developed user plug-in could also serve in future research works associated to this subject.
format article
author Hayssam O. Elhusseiny
Ibrahim Nosair
A. Samer Ezeldin
author_facet Hayssam O. Elhusseiny
Ibrahim Nosair
A. Samer Ezeldin
author_sort Hayssam O. Elhusseiny
title Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt
title_short Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt
title_full Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt
title_fullStr Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt
title_full_unstemmed Developing a user plug-in to assess delay causes’ impact on construction projects in Egypt
title_sort developing a user plug-in to assess delay causes’ impact on construction projects in egypt
publisher Elsevier
publishDate 2021
url https://doaj.org/article/8f2a2aaea41c4e3184856a7a1ec7ff97
work_keys_str_mv AT hayssamoelhusseiny developingauserplugintoassessdelaycausesimpactonconstructionprojectsinegypt
AT ibrahimnosair developingauserplugintoassessdelaycausesimpactonconstructionprojectsinegypt
AT asamerezeldin developingauserplugintoassessdelaycausesimpactonconstructionprojectsinegypt
_version_ 1718418235997552640