TECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT

The reason why most of the application projects are unsuccesful results from not doing Project area examination, measuring and assessing effectively. Therefore, the methods examination, measuring and assessing which will be realized in the Project area should be applied. In order that development st...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Abdulkadir DAĞLI, Birol AKGÜL
Formato: article
Lenguaje:DE
EN
FR
TR
Publicado: Fırat University 2019
Materias:
H
Acceso en línea:https://doaj.org/article/90ed1cbcd48445c089d426c6c832008d
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:90ed1cbcd48445c089d426c6c832008d
record_format dspace
spelling oai:doaj.org-article:90ed1cbcd48445c089d426c6c832008d2021-11-24T09:20:44ZTECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT2148-416310.9761/JASSS7231https://doaj.org/article/90ed1cbcd48445c089d426c6c832008d2019-08-01T00:00:00Zhttps://jasstudies.com/index.jsp?mod=tammetin&makaleadi=706814612_18-%C3%96%C4%9Fr.%20G%C3%B6r.%20Abdulkadir%20Da%C4%9Fl%C4%B1.pdf&key=28455https://doaj.org/toc/2148-4163The reason why most of the application projects are unsuccesful results from not doing Project area examination, measuring and assessing effectively. Therefore, the methods examination, measuring and assessing which will be realized in the Project area should be applied. In order that development studies based on a project can be successful. Development studies, when studied around the world; It is determined that the developed countries allocate their resources primarily to local development projects and later to large scale national development projects. When the development studies of many countries that have provided development in the world are analyzed; It can be reached that the local development studies should be prioritized in order to ensure the development of Turkey. One of the most effective methods that should be used is to apply the techniques of examination, measuring and assessing based on a certain model. In this study, the Focused Local Development (OYKA) Model, in which beneficial model copyright rights were obtained and we utilized Focused Local Development to the sources, opportunities and historical artifacts of the specified area. For example, open areas, caves, industrial fAacilities, agriculturel enterprises, dangerous chemical plants and historical places can be examined, measured and assessed. Within the scope of examination and measurement studies realized in the Project area, from clothing of the Project team to the first aid practices, from the use of measuring instruments to the making of laboratory analyzes to determine the physical and chemical properties of the sample, all these studies constitute the subject of this study.Abdulkadir DAĞLIBirol AKGÜLFırat Universityarticlelocal developmentarea examinationmeasurementassessmentprojectSocial SciencesHSocial sciences (General)H1-99DEENFRTRJournal of Academic Social Science Studies , Vol 10, Iss 61, Pp 229-238 (2019)
institution DOAJ
collection DOAJ
language DE
EN
FR
TR
topic local development
area examination
measurement
assessment
project
Social Sciences
H
Social sciences (General)
H1-99
spellingShingle local development
area examination
measurement
assessment
project
Social Sciences
H
Social sciences (General)
H1-99
Abdulkadir DAĞLI
Birol AKGÜL
TECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT
description The reason why most of the application projects are unsuccesful results from not doing Project area examination, measuring and assessing effectively. Therefore, the methods examination, measuring and assessing which will be realized in the Project area should be applied. In order that development studies based on a project can be successful. Development studies, when studied around the world; It is determined that the developed countries allocate their resources primarily to local development projects and later to large scale national development projects. When the development studies of many countries that have provided development in the world are analyzed; It can be reached that the local development studies should be prioritized in order to ensure the development of Turkey. One of the most effective methods that should be used is to apply the techniques of examination, measuring and assessing based on a certain model. In this study, the Focused Local Development (OYKA) Model, in which beneficial model copyright rights were obtained and we utilized Focused Local Development to the sources, opportunities and historical artifacts of the specified area. For example, open areas, caves, industrial fAacilities, agriculturel enterprises, dangerous chemical plants and historical places can be examined, measured and assessed. Within the scope of examination and measurement studies realized in the Project area, from clothing of the Project team to the first aid practices, from the use of measuring instruments to the making of laboratory analyzes to determine the physical and chemical properties of the sample, all these studies constitute the subject of this study.
format article
author Abdulkadir DAĞLI
Birol AKGÜL
author_facet Abdulkadir DAĞLI
Birol AKGÜL
author_sort Abdulkadir DAĞLI
title TECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT
title_short TECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT
title_full TECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT
title_fullStr TECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT
title_full_unstemmed TECHNIQUES OF MEASUREMENT AND ASSESMENT OF THE EXAMINATİON IN THE PROJECT AREA IN STUDYING LOCAL DEVELOPMENT BASED ON A PROJECT
title_sort techniques of measurement and assesment of the examinati̇on in the project area in studying local development based on a project
publisher Fırat University
publishDate 2019
url https://doaj.org/article/90ed1cbcd48445c089d426c6c832008d
work_keys_str_mv AT abdulkadirdagli techniquesofmeasurementandassesmentoftheexaminationintheprojectareainstudyinglocaldevelopmentbasedonaproject
AT birolakgul techniquesofmeasurementandassesmentoftheexaminationintheprojectareainstudyinglocaldevelopmentbasedonaproject
_version_ 1718415557555912704