Studio In-Situ
This photo essay explores the possibility of radically shifting the understanding of the design studio as a spatial construct. By considering the seven-year evolution of a (socalled) design-build project known as the Imizamo Yethu Water Platforms, it recognises the possibility of dislocating the des...
Guardado en:
Autor principal: | |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Jap Sam Books
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/916bfdc54634488a9a05356d39d19327 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sumario: | This photo essay explores the possibility of radically shifting the understanding of the design studio as a spatial construct. By considering the seven-year evolution of a (socalled) design-build project known as the Imizamo Yethu Water Platforms, it recognises the possibility of dislocating the design studio from its traditionally centralised space in the academy and moving it to the site of its investigation or intervention for the duration of a project. The Imizamo Yethu Water Platforms aimed to improve water and sanitation infrastructure in a severely under-resourced informal settlement in Cape Town, South Africa, through the insertion of small permanent public spaces. Due to a number of reasons, including the physical characteristics of the sites selected for these spaces, the design studio gradually shifted its physical location to such an extent that virtually the entire design, documentation and construction process took place in-situ. |
---|