Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning
The working environment of underground mines is complicated, making it difficult to construct an underground mine production plan. In response to the requirements for the preparation of a short-term production plan for underground mines, an optimization model for short-term resource planning was con...
Guardado en:
Autores principales: | , , , , , , , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/944e21bec1ab461fbb92dad8d8b81ff6 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:944e21bec1ab461fbb92dad8d8b81ff6 |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:944e21bec1ab461fbb92dad8d8b81ff62021-11-25T18:22:23ZDispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning10.3390/met111118482075-4701https://doaj.org/article/944e21bec1ab461fbb92dad8d8b81ff62021-11-01T00:00:00Zhttps://www.mdpi.com/2075-4701/11/11/1848https://doaj.org/toc/2075-4701The working environment of underground mines is complicated, making it difficult to construct an underground mine production plan. In response to the requirements for the preparation of a short-term production plan for underground mines, an optimization model for short-term resource planning was constructed, with the goal of maximizing the total revenue during the planning period. The artificial bee colony optimization algorithm is used to solve the model using MATLAB. According to the basic requirements of underground mine ore haulage and ore hoisting, a haulage equipment inter-stopes dispatch plan model was constructed, with the primary goal of minimizing the haulage equipment wait time. A non-dominated sorting genetic algorithm is used to solve the optimization model. An underground mine is examined using the two models, and the optimization results are compared and verified with the scheme obtained by using traditional optimization algorithms. Results show that based on the improved optimization algorithm, the use of short-term production planning schemes to guide mine production operations can increase the haulage equipment utilization rate, thereby increasing mine production revenue.Ning LiShuzhao FengHaiwang YeQizhou WangMingtao JiaLiguan WangShugang ZhaoDongfang ChenMDPI AGarticledigital minemine short-term production planninghaulage equipment dispatch planABCANSGAMining engineering. MetallurgyTN1-997ENMetals, Vol 11, Iss 1848, p 1848 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
digital mine mine short-term production planning haulage equipment dispatch plan ABCA NSGA Mining engineering. Metallurgy TN1-997 |
spellingShingle |
digital mine mine short-term production planning haulage equipment dispatch plan ABCA NSGA Mining engineering. Metallurgy TN1-997 Ning Li Shuzhao Feng Haiwang Ye Qizhou Wang Mingtao Jia Liguan Wang Shugang Zhao Dongfang Chen Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning |
description |
The working environment of underground mines is complicated, making it difficult to construct an underground mine production plan. In response to the requirements for the preparation of a short-term production plan for underground mines, an optimization model for short-term resource planning was constructed, with the goal of maximizing the total revenue during the planning period. The artificial bee colony optimization algorithm is used to solve the model using MATLAB. According to the basic requirements of underground mine ore haulage and ore hoisting, a haulage equipment inter-stopes dispatch plan model was constructed, with the primary goal of minimizing the haulage equipment wait time. A non-dominated sorting genetic algorithm is used to solve the optimization model. An underground mine is examined using the two models, and the optimization results are compared and verified with the scheme obtained by using traditional optimization algorithms. Results show that based on the improved optimization algorithm, the use of short-term production planning schemes to guide mine production operations can increase the haulage equipment utilization rate, thereby increasing mine production revenue. |
format |
article |
author |
Ning Li Shuzhao Feng Haiwang Ye Qizhou Wang Mingtao Jia Liguan Wang Shugang Zhao Dongfang Chen |
author_facet |
Ning Li Shuzhao Feng Haiwang Ye Qizhou Wang Mingtao Jia Liguan Wang Shugang Zhao Dongfang Chen |
author_sort |
Ning Li |
title |
Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning |
title_short |
Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning |
title_full |
Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning |
title_fullStr |
Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning |
title_full_unstemmed |
Dispatch Optimization Model for Haulage Equipment between Stopes Based on Mine Short-Term Resource Planning |
title_sort |
dispatch optimization model for haulage equipment between stopes based on mine short-term resource planning |
publisher |
MDPI AG |
publishDate |
2021 |
url |
https://doaj.org/article/944e21bec1ab461fbb92dad8d8b81ff6 |
work_keys_str_mv |
AT ningli dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning AT shuzhaofeng dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning AT haiwangye dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning AT qizhouwang dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning AT mingtaojia dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning AT liguanwang dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning AT shugangzhao dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning AT dongfangchen dispatchoptimizationmodelforhaulageequipmentbetweenstopesbasedonmineshorttermresourceplanning |
_version_ |
1718411272562671616 |