METODE LOGIKA FUZZY SEBAGAI EVALUASI DISTRIBUSI DAYA LISTRIK BERDASARKAN BEBAN PUNCAK PEMBANGKIT TENAGA LISTRIK
Evaluation of peak load on the power system is raised very influential on the development of electric power availability in the various provinces. By reviewing the peak load for a year, can be implemented for the evaluation of power generation as a simulation of the electrical energy supply for the...
Guardado en:
Autores principales: | Fifi D. Rosalina, Yuniar Farida, Abdulloh Hamid |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Department of Mathematics, UIN Sunan Ampel Surabaya
2016
|
Materias: | |
Acceso en línea: | https://doaj.org/article/95485c42638b41c7a3ca997c226c82b2 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Model Rangkaian-T Pembangkit Listrik Tenaga Bayu untuk Analisis Aliran Daya Tiga-Fase
por: Rudy Gianto
Publicado: (2021) -
Estimasi State-Of-Charge Menggunakan Simulink Pada Baterai Pembangkit Listrik Tenaga Surya
por: Bambang Sugeng, et al.
Publicado: (2019) -
SISTEM MONITORING DAN KLASTER KETERSEDIAAN ENERGI MENGGUNAKAN METODE K-MEANS PADA PEMBANGKIT LISTRIK TENAGA SURYA
por: Abdul Haris, et al.
Publicado: (2019) -
Pemanfaatan Saluran Irigasi Untuk Pembangkit Listrik Pikohidro Dengan Generator DC Shunt
por: Winarso, et al.
Publicado: (2021) -
Studi Skenario Load Shedding Pada Penyulang Dalam Operasi Sistem Tenaga Listrik Menggunakan Under Frequency Relay
por: Sofyar Sofyar
Publicado: (2020)