Risk and benefit analysis of multifunctional reservoir staged operating
An optimal flood-limiting water level (FLWL) is needed to solve the contradiction between flood control safety measures and utilizable benefits. Therefore, this paper took the Chengbi River reservoir as an example, applied the Monte Carlo stochastic simulation and water consumption rate per unit of...
Guardado en:
Autores principales: | Chongxun Mo, Yifan Wu, Yuli Ruan, Shutan Zhao, Juliang Jin |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
IWA Publishing
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/956433ba793d48c798fac81d3461d896 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Profitability improvement of a reservoir power station based on virtual reservoir bidding
por: Yanmei Zhu, et al.
Publicado: (2021) -
Multi-objective optimal operation of reservoir group in Jialing River based on DREAM algorithm
por: Wei Diao, et al.
Publicado: (2021) -
Quantitative assessment of water level regime alterations during 1959–2016 caused by Three Gorges Reservoir in the Dongting Lake, China
por: Hongxiang Wang, et al.
Publicado: (2021) -
Optimal water allocation method for joint operation of a reservoir and pumping station under insufficient irrigation
por: Cong Wei, et al.
Publicado: (2021) -
Water quality index and spatio-temporal perspective of a large Brazilian water reservoir
por: Karla Lorrane de Oliveira, et al.
Publicado: (2021)