Management of the “building-base system” action, using a life cycle model
Abstract This research aims to highlight the problem of creating various models that reflect the life cycle of the “building-base” system, and link the reliability of this system with its technical condition. Based on the proposed model of the life cycle “reconstructed building-base”, it is possible...
Guardado en:
Autores principales: | , , , , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Nature Portfolio
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/96a573644766409d9fc1fe43479c7ef1 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:96a573644766409d9fc1fe43479c7ef1 |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:96a573644766409d9fc1fe43479c7ef12021-12-02T17:27:19ZManagement of the “building-base system” action, using a life cycle model10.1038/s41598-021-98367-02045-2322https://doaj.org/article/96a573644766409d9fc1fe43479c7ef12021-09-01T00:00:00Zhttps://doi.org/10.1038/s41598-021-98367-0https://doaj.org/toc/2045-2322Abstract This research aims to highlight the problem of creating various models that reflect the life cycle of the “building-base” system, and link the reliability of this system with its technical condition. Based on the proposed model of the life cycle “reconstructed building-base”, it is possible to regulate the condition of the building towards its restoration, changing the category of technical condition to higher and obtain new, adequate to the current state, reliability indicators. During the operation of this model, it is possible to control the system management on the basis of the obtained quantitative values of reliability. The result of the reliability calculation is the determination of such a technical solution of strengthening the “building-base” system, which will provide a given level of reliability. The research provides an example of the calculation of an operable monumental building before and after its restoration.Justyna Sobczak-PiąstkaOksana KichaevaPavlo FirsovSergey ZolotovYuriy FamulyakNature PortfolioarticleMedicineRScienceQENScientific Reports, Vol 11, Iss 1, Pp 1-8 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
Medicine R Science Q |
spellingShingle |
Medicine R Science Q Justyna Sobczak-Piąstka Oksana Kichaeva Pavlo Firsov Sergey Zolotov Yuriy Famulyak Management of the “building-base system” action, using a life cycle model |
description |
Abstract This research aims to highlight the problem of creating various models that reflect the life cycle of the “building-base” system, and link the reliability of this system with its technical condition. Based on the proposed model of the life cycle “reconstructed building-base”, it is possible to regulate the condition of the building towards its restoration, changing the category of technical condition to higher and obtain new, adequate to the current state, reliability indicators. During the operation of this model, it is possible to control the system management on the basis of the obtained quantitative values of reliability. The result of the reliability calculation is the determination of such a technical solution of strengthening the “building-base” system, which will provide a given level of reliability. The research provides an example of the calculation of an operable monumental building before and after its restoration. |
format |
article |
author |
Justyna Sobczak-Piąstka Oksana Kichaeva Pavlo Firsov Sergey Zolotov Yuriy Famulyak |
author_facet |
Justyna Sobczak-Piąstka Oksana Kichaeva Pavlo Firsov Sergey Zolotov Yuriy Famulyak |
author_sort |
Justyna Sobczak-Piąstka |
title |
Management of the “building-base system” action, using a life cycle model |
title_short |
Management of the “building-base system” action, using a life cycle model |
title_full |
Management of the “building-base system” action, using a life cycle model |
title_fullStr |
Management of the “building-base system” action, using a life cycle model |
title_full_unstemmed |
Management of the “building-base system” action, using a life cycle model |
title_sort |
management of the “building-base system” action, using a life cycle model |
publisher |
Nature Portfolio |
publishDate |
2021 |
url |
https://doaj.org/article/96a573644766409d9fc1fe43479c7ef1 |
work_keys_str_mv |
AT justynasobczakpiastka managementofthebuildingbasesystemactionusingalifecyclemodel AT oksanakichaeva managementofthebuildingbasesystemactionusingalifecyclemodel AT pavlofirsov managementofthebuildingbasesystemactionusingalifecyclemodel AT sergeyzolotov managementofthebuildingbasesystemactionusingalifecyclemodel AT yuriyfamulyak managementofthebuildingbasesystemactionusingalifecyclemodel |
_version_ |
1718380803654680576 |