Implementing and continuity of lean construction using discrete event simulation

The success of lean principles in manufacturing and the benefits arising from its use is one of the main motivations for adopting lean principles in construction .The lean construction strives for the same goals as lean production, namely to eliminate waste and to maximize value. One of the basic co...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Shahin Dabirian, Seyed. Rohollah Ghorashi
Formato: article
Lenguaje:FA
Publicado: Iranian Society of Structrual Engineering (ISSE) 2019
Materias:
Acceso en línea:https://doaj.org/article/96c93b14231b45b88f82fe0ac3b35820
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:96c93b14231b45b88f82fe0ac3b35820
record_format dspace
spelling oai:doaj.org-article:96c93b14231b45b88f82fe0ac3b358202021-11-08T15:50:45ZImplementing and continuity of lean construction using discrete event simulation2476-39772538-261610.22065/jsce.2017.84607.1196https://doaj.org/article/96c93b14231b45b88f82fe0ac3b358202019-02-01T00:00:00Zhttps://www.jsce.ir/article_87075_322f481973586fe347b530fc87102b0b.pdfhttps://doaj.org/toc/2476-3977https://doaj.org/toc/2538-2616The success of lean principles in manufacturing and the benefits arising from its use is one of the main motivations for adopting lean principles in construction .The lean construction strives for the same goals as lean production, namely to eliminate waste and to maximize value. One of the basic concepts in lean construction is called “perfection”, meaning that efforts made to decrease waste in every single phase of the projects has no limit and the enhancements resulted from implementation of lean principles must always be retained and improved. This paper pays attention to application of lean thinking in one of construction fields as a case study. Another aim could be mentioned as continuity of resulted enhancements caused by application of the theory by following perfection principle. To achieve and investigate the results, discrete event simulation for making activity under-study cycle model has been used. The case study in this research is foam concrete process in execution phase. The required data for building the simulation model has been collected using work and time study technique. Primary results show that different kinds of waste in a construction process can be reduced via adopting lean construction principles using computer simulation. The results obtained from applying lean principles demonstrate enhancement in performance of foam concrete cycle up to 15% and decrease in time up to 36%.Shahin DabirianSeyed. Rohollah GhorashiIranian Society of Structrual Engineering (ISSE)articlelean constructionlean principleslean thinkingdiscrete event simulationperfectionBridge engineeringTG1-470Building constructionTH1-9745FAJournal of Structural and Construction Engineering, Vol 5, Iss 4, Pp 93-111 (2019)
institution DOAJ
collection DOAJ
language FA
topic lean construction
lean principles
lean thinking
discrete event simulation
perfection
Bridge engineering
TG1-470
Building construction
TH1-9745
spellingShingle lean construction
lean principles
lean thinking
discrete event simulation
perfection
Bridge engineering
TG1-470
Building construction
TH1-9745
Shahin Dabirian
Seyed. Rohollah Ghorashi
Implementing and continuity of lean construction using discrete event simulation
description The success of lean principles in manufacturing and the benefits arising from its use is one of the main motivations for adopting lean principles in construction .The lean construction strives for the same goals as lean production, namely to eliminate waste and to maximize value. One of the basic concepts in lean construction is called “perfection”, meaning that efforts made to decrease waste in every single phase of the projects has no limit and the enhancements resulted from implementation of lean principles must always be retained and improved. This paper pays attention to application of lean thinking in one of construction fields as a case study. Another aim could be mentioned as continuity of resulted enhancements caused by application of the theory by following perfection principle. To achieve and investigate the results, discrete event simulation for making activity under-study cycle model has been used. The case study in this research is foam concrete process in execution phase. The required data for building the simulation model has been collected using work and time study technique. Primary results show that different kinds of waste in a construction process can be reduced via adopting lean construction principles using computer simulation. The results obtained from applying lean principles demonstrate enhancement in performance of foam concrete cycle up to 15% and decrease in time up to 36%.
format article
author Shahin Dabirian
Seyed. Rohollah Ghorashi
author_facet Shahin Dabirian
Seyed. Rohollah Ghorashi
author_sort Shahin Dabirian
title Implementing and continuity of lean construction using discrete event simulation
title_short Implementing and continuity of lean construction using discrete event simulation
title_full Implementing and continuity of lean construction using discrete event simulation
title_fullStr Implementing and continuity of lean construction using discrete event simulation
title_full_unstemmed Implementing and continuity of lean construction using discrete event simulation
title_sort implementing and continuity of lean construction using discrete event simulation
publisher Iranian Society of Structrual Engineering (ISSE)
publishDate 2019
url https://doaj.org/article/96c93b14231b45b88f82fe0ac3b35820
work_keys_str_mv AT shahindabirian implementingandcontinuityofleanconstructionusingdiscreteeventsimulation
AT seyedrohollahghorashi implementingandcontinuityofleanconstructionusingdiscreteeventsimulation
_version_ 1718441685889843200