Probabilistic Short-Term Load Forecasting Incorporating Behind-the-Meter (BTM) Photovoltaic (PV) Generation and Battery Energy Storage Systems (BESSs)
Increased behind-the-meter (BTM) solar generation causes additional errors in short-term load forecasting. To ensure power grid reliability, it is necessary to consider the influence of the behind-the-meter distributed resources. This study proposes a method to estimate the size of behind-the-meter...
Guardado en:
Autores principales: | , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/975b913abb814f3fbf9ff6aa02f9efd3 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sea el primero en dejar un comentario!