Quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?

The impact of transport on climate change is becoming increasingly significant, making switching to sustainable vehicles an important step in emission reduction. The use of electric vehicles could be stimulated by a large network of charging stations. However, in Brussels, this network is still limi...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Quentin De Clerck, Lieselot Vanhaverbeke
Formato: article
Lenguaje:EN
FR
NL
Publicado: Université Saint-Louis Bruxelles 2021
Materias:
H
Acceso en línea:https://doaj.org/article/9ae87b3c4ab943d4b446ed947e75a136
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:9ae87b3c4ab943d4b446ed947e75a136
record_format dspace
spelling oai:doaj.org-article:9ae87b3c4ab943d4b446ed947e75a1362021-12-02T10:59:35ZQuels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?2031-029310.4000/brussels.5807https://doaj.org/article/9ae87b3c4ab943d4b446ed947e75a1362021-11-01T00:00:00Zhttp://journals.openedition.org/brussels/5807https://doaj.org/toc/2031-0293The impact of transport on climate change is becoming increasingly significant, making switching to sustainable vehicles an important step in emission reduction. The use of electric vehicles could be stimulated by a large network of charging stations. However, in Brussels, this network is still limited. In this paper, we propose two complementary methods that can support the deployment of a charging infrastructure. The analysis for public occasional charging is a point of interest (POI) based approach as it demonstrates that the accessibility of the charging infrastructure is improved if charging stations are installed at important Brussels mobility poles. Locations for public residential charging are identified by means of location models that take into account demand forecasts for EVs. The resulting roll-out is first pushed through where the estimated EV adoption is high and then spreads evenly across the entire Region. The combination of both methods offers a solution for residents (location models), as well as for visitors or commuters (POI approach).Quentin De ClerckLieselot VanhaverbekeUniversité Saint-Louis Bruxellesarticlemobilitéinfrastructures urbainesSocial SciencesHENFRNLBrussels Studies (2021)
institution DOAJ
collection DOAJ
language EN
FR
NL
topic mobilité
infrastructures urbaines
Social Sciences
H
spellingShingle mobilité
infrastructures urbaines
Social Sciences
H
Quentin De Clerck
Lieselot Vanhaverbeke
Quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?
description The impact of transport on climate change is becoming increasingly significant, making switching to sustainable vehicles an important step in emission reduction. The use of electric vehicles could be stimulated by a large network of charging stations. However, in Brussels, this network is still limited. In this paper, we propose two complementary methods that can support the deployment of a charging infrastructure. The analysis for public occasional charging is a point of interest (POI) based approach as it demonstrates that the accessibility of the charging infrastructure is improved if charging stations are installed at important Brussels mobility poles. Locations for public residential charging are identified by means of location models that take into account demand forecasts for EVs. The resulting roll-out is first pushed through where the estimated EV adoption is high and then spreads evenly across the entire Region. The combination of both methods offers a solution for residents (location models), as well as for visitors or commuters (POI approach).
format article
author Quentin De Clerck
Lieselot Vanhaverbeke
author_facet Quentin De Clerck
Lieselot Vanhaverbeke
author_sort Quentin De Clerck
title Quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?
title_short Quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?
title_full Quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?
title_fullStr Quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?
title_full_unstemmed Quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en Région de Bruxelles-Capitale ?
title_sort quels modèles pour le déploiement d’une infrastructure de recharge publique pour véhicules électriques en région de bruxelles-capitale ?
publisher Université Saint-Louis Bruxelles
publishDate 2021
url https://doaj.org/article/9ae87b3c4ab943d4b446ed947e75a136
work_keys_str_mv AT quentindeclerck quelsmodelespourledeploiementduneinfrastructurederechargepubliquepourvehiculeselectriquesenregiondebruxellescapitale
AT lieselotvanhaverbeke quelsmodelespourledeploiementduneinfrastructurederechargepubliquepourvehiculeselectriquesenregiondebruxellescapitale
_version_ 1718396368139059200