Condition Assessment of Solar Modules by Flash Test and Electroluminescence Test

The Hungarian society and the Hungarian state are constantly increasing their solar capacity. More and more solar power plants are being put into operation. The largest of these has a 100 MW peak capacity. Such power plants do not require constant maintenance. However, in the case of low productivit...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: István Bodnár, Dávid Matusz-Kalász, Rafael Ruben Boros, Róbert Lipták
Formato: article
Lenguaje:EN
Publicado: MDPI AG 2021
Materias:
Acceso en línea:https://doaj.org/article/9b284749ae2649d0b482417405981faf
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Descripción
Sumario:The Hungarian society and the Hungarian state are constantly increasing their solar capacity. More and more solar power plants are being put into operation. The largest of these has a 100 MW peak capacity. Such power plants do not require constant maintenance. However, in the case of low productivity, a conditional assessment is required. The reason for production loss can also be manufacturing, installation, and operational errors. A flying drone was used for finding failures by thermographic scouting. Furthermore, electroluminescent (EL) and flash tests give a comprehensive view of the real state of the modules in a mobile laboratory. We had the opportunity to summarize these test results of more than a thousand modules operating in a solar power plant. The report on the power plant shows that a significant part of the modules became unusable in a short time. After four years, 10% of the 260 Wp modules suffered a performance reduction of more than 10%.