Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan
PT X is a small enterprise producing various types of jute fabric products. As a traditional business, the company still largely rely on the handiness and crafting skills from their workers. Whilst the business competition increases, PT X requires to strengthen the business by improving product qual...
Guardado en:
Autores principales: | , |
---|---|
Formato: | article |
Lenguaje: | EN ID |
Publicado: |
LPPM Universitas Katolik Parahyangan
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/9e830d550a024b829d3e519997c4168a |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:9e830d550a024b829d3e519997c4168a |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:9e830d550a024b829d3e519997c4168a2021-11-09T02:44:07ZIntegrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan0216-10362339-149910.26593/jrsi.v10i2.4064.113-120https://doaj.org/article/9e830d550a024b829d3e519997c4168a2021-10-01T00:00:00Zhttps://journal.unpar.ac.id/index.php/jrsi/article/view/4064https://doaj.org/toc/0216-1036https://doaj.org/toc/2339-1499PT X is a small enterprise producing various types of jute fabric products. As a traditional business, the company still largely rely on the handiness and crafting skills from their workers. Whilst the business competition increases, PT X requires to strengthen the business by improving product quality in an efficient way. Besides high level of defects, PT X has also non-value-added activities in their production resulting in high overtime hours of their workers. Although PT X considers the overtime is acceptable to achieve the production target, there is room for improvement to reduce the defects as well as to shorten the production lead time. This paper aims to tackle the inefficiency and quality of the company. Lean six sigma is proposed to improve the condition and change management is implemented to ensure the commitment and participation of all staff for the success of change. Hence, this paper proposes the combination of change management and lean six sigma to improve production quality, lead time and staff participation. Combining DMAIC methods with change management, a methodology called DMA(C)IC is used with the middle C is for change. The implementation of the integration between change management in lean six sigma has resulted in the reduced number of defects and shorter lead time and the awareness of the workers to improve their working behavior.Ayesha Gilang PraharaCatharina Badra NawangpalupiLPPM Universitas Katolik Parahyanganarticlechange management, lean six sigma, defects, dmaic, quality improvementIndustrial engineering. Management engineeringT55.4-60.8ENIDJurnal Rekayasa Sistem Industri, Vol 10, Iss 2, Pp 113-120 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN ID |
topic |
change management, lean six sigma, defects, dmaic, quality improvement Industrial engineering. Management engineering T55.4-60.8 |
spellingShingle |
change management, lean six sigma, defects, dmaic, quality improvement Industrial engineering. Management engineering T55.4-60.8 Ayesha Gilang Prahara Catharina Badra Nawangpalupi Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan |
description |
PT X is a small enterprise producing various types of jute fabric products. As a traditional business, the company still largely rely on the handiness and crafting skills from their workers. Whilst the business competition increases, PT X requires to strengthen the business by improving product quality in an efficient way. Besides high level of defects, PT X has also non-value-added activities in their production resulting in high overtime hours of their workers. Although PT X considers the overtime is acceptable to achieve the production target, there is room for improvement to reduce the defects as well as to shorten the production lead time. This paper aims to tackle the inefficiency and quality of the company. Lean six sigma is proposed to improve the condition and change management is implemented to ensure the commitment and participation of all staff for the success of change. Hence, this paper proposes the combination of change management and lean six sigma to improve production quality, lead time and staff participation. Combining DMAIC methods with change management, a methodology called DMA(C)IC is used with the middle C is for change. The implementation of the integration between change management in lean six sigma has resulted in the reduced number of defects and shorter lead time and the awareness of the workers to improve their working behavior. |
format |
article |
author |
Ayesha Gilang Prahara Catharina Badra Nawangpalupi |
author_facet |
Ayesha Gilang Prahara Catharina Badra Nawangpalupi |
author_sort |
Ayesha Gilang Prahara |
title |
Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan |
title_short |
Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan |
title_full |
Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan |
title_fullStr |
Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan |
title_full_unstemmed |
Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan |
title_sort |
integrasi manajemen perubahan pada proyek lean six sigma dalam peningkatan mutu dan kinerja perusahaan |
publisher |
LPPM Universitas Katolik Parahyangan |
publishDate |
2021 |
url |
https://doaj.org/article/9e830d550a024b829d3e519997c4168a |
work_keys_str_mv |
AT ayeshagilangprahara integrasimanajemenperubahanpadaproyekleansixsigmadalampeningkatanmutudankinerjaperusahaan AT catharinabadranawangpalupi integrasimanajemenperubahanpadaproyekleansixsigmadalampeningkatanmutudankinerjaperusahaan |
_version_ |
1718441406641471488 |