Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan

PT X is a small enterprise producing various types of jute fabric products. As a traditional business, the company still largely rely on the handiness and crafting skills from their workers. Whilst the business competition increases, PT X requires to strengthen the business by improving product qual...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Ayesha Gilang Prahara, Catharina Badra Nawangpalupi
Formato: article
Lenguaje:EN
ID
Publicado: LPPM Universitas Katolik Parahyangan 2021
Materias:
Acceso en línea:https://doaj.org/article/9e830d550a024b829d3e519997c4168a
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:9e830d550a024b829d3e519997c4168a
record_format dspace
spelling oai:doaj.org-article:9e830d550a024b829d3e519997c4168a2021-11-09T02:44:07ZIntegrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan0216-10362339-149910.26593/jrsi.v10i2.4064.113-120https://doaj.org/article/9e830d550a024b829d3e519997c4168a2021-10-01T00:00:00Zhttps://journal.unpar.ac.id/index.php/jrsi/article/view/4064https://doaj.org/toc/0216-1036https://doaj.org/toc/2339-1499PT X is a small enterprise producing various types of jute fabric products. As a traditional business, the company still largely rely on the handiness and crafting skills from their workers. Whilst the business competition increases, PT X requires to strengthen the business by improving product quality in an efficient way. Besides high level of defects, PT X has also non-value-added activities in their production resulting in high overtime hours of their workers. Although PT X considers the overtime is acceptable to achieve the production target, there is room for improvement to reduce the defects as well as to shorten the production lead time. This paper aims to tackle the inefficiency and quality of the company. Lean six sigma is proposed to improve the condition and change management is implemented to ensure the commitment and participation of all staff for the success of change. Hence, this paper proposes the combination of change management and lean six sigma to improve production quality, lead time and staff participation. Combining DMAIC methods with change management, a methodology called DMA(C)IC is used with the middle C is for change. The implementation of the integration between change management in lean six sigma has resulted in the reduced number of defects and shorter lead time and the awareness of the workers to improve their working behavior.Ayesha Gilang PraharaCatharina Badra NawangpalupiLPPM Universitas Katolik Parahyanganarticlechange management, lean six sigma, defects, dmaic, quality improvementIndustrial engineering. Management engineeringT55.4-60.8ENIDJurnal Rekayasa Sistem Industri, Vol 10, Iss 2, Pp 113-120 (2021)
institution DOAJ
collection DOAJ
language EN
ID
topic change management, lean six sigma, defects, dmaic, quality improvement
Industrial engineering. Management engineering
T55.4-60.8
spellingShingle change management, lean six sigma, defects, dmaic, quality improvement
Industrial engineering. Management engineering
T55.4-60.8
Ayesha Gilang Prahara
Catharina Badra Nawangpalupi
Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan
description PT X is a small enterprise producing various types of jute fabric products. As a traditional business, the company still largely rely on the handiness and crafting skills from their workers. Whilst the business competition increases, PT X requires to strengthen the business by improving product quality in an efficient way. Besides high level of defects, PT X has also non-value-added activities in their production resulting in high overtime hours of their workers. Although PT X considers the overtime is acceptable to achieve the production target, there is room for improvement to reduce the defects as well as to shorten the production lead time. This paper aims to tackle the inefficiency and quality of the company. Lean six sigma is proposed to improve the condition and change management is implemented to ensure the commitment and participation of all staff for the success of change. Hence, this paper proposes the combination of change management and lean six sigma to improve production quality, lead time and staff participation. Combining DMAIC methods with change management, a methodology called DMA(C)IC is used with the middle C is for change. The implementation of the integration between change management in lean six sigma has resulted in the reduced number of defects and shorter lead time and the awareness of the workers to improve their working behavior.
format article
author Ayesha Gilang Prahara
Catharina Badra Nawangpalupi
author_facet Ayesha Gilang Prahara
Catharina Badra Nawangpalupi
author_sort Ayesha Gilang Prahara
title Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan
title_short Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan
title_full Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan
title_fullStr Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan
title_full_unstemmed Integrasi Manajemen Perubahan pada Proyek Lean Six Sigma dalam Peningkatan Mutu dan Kinerja Perusahaan
title_sort integrasi manajemen perubahan pada proyek lean six sigma dalam peningkatan mutu dan kinerja perusahaan
publisher LPPM Universitas Katolik Parahyangan
publishDate 2021
url https://doaj.org/article/9e830d550a024b829d3e519997c4168a
work_keys_str_mv AT ayeshagilangprahara integrasimanajemenperubahanpadaproyekleansixsigmadalampeningkatanmutudankinerjaperusahaan
AT catharinabadranawangpalupi integrasimanajemenperubahanpadaproyekleansixsigmadalampeningkatanmutudankinerjaperusahaan
_version_ 1718441406641471488