Research on multi-objective optimal scheduling considering the balance of labor workload distribution.
In order to solve the problem of unbalanced workload of employees in parallel flow shop scheduling, a method of job standard balance is proposed to describe the work balance of employees. The minimum delay time of completion and the imbalance of employee work are taken as the two goals of the model....
Saved in:
Main Authors: | Zhengyu Hu, Wenrui Liu, Shengchen Ling, Kuan Fan |
---|---|
Format: | article |
Language: | EN |
Published: |
Public Library of Science (PLoS)
2021
|
Subjects: | |
Online Access: | https://doaj.org/article/9ef36f7046b54224b8a64cce8cc846ee |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Flight schedule adjustment for hub airports using multi-objective optimization
by: Tao Mei, et al.
Published: (2021) -
Multi-objective optimal power flow considering the multi-terminal direct current
by: B. Ayachi, et al.
Published: (2021) -
Multi-Level Cooperative Scheduling Based on Robust Optimization Considering Flexibilities and Uncertainties of ADN and MG
by: Ziqi Zhang, et al.
Published: (2021) -
Modeling and Optimization of Robust Scheduling Template Considering Equipment Failure
by: FANG Jia, et al.
Published: (2020) -
Optimization of time, cost and quality in critical chain method in multi project scheduling and resource constraints with considering utility function
by: Mohammad Javad Taheri Amiri, et al.
Published: (2020)