Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies

In general, the long-term maintenance planning of residential buildings is performed based on uniform repair times. However, in fact, various factors, such as the quality and user patterns, affect the performance of residential building components in the Operation and Maintenance (O&M) phase. He...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Youngduk Cho, Sanghyo Lee, Joosung Lee, Jaejun Kim
Formato: article
Lenguaje:EN
Publicado: MDPI AG 2021
Materias:
Acceso en línea:https://doaj.org/article/9ef67a04faf2466b888785061f3c9d09
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:9ef67a04faf2466b888785061f3c9d09
record_format dspace
spelling oai:doaj.org-article:9ef67a04faf2466b888785061f3c9d092021-11-25T19:01:06ZAnalysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies10.3390/su1322124432071-1050https://doaj.org/article/9ef67a04faf2466b888785061f3c9d092021-11-01T00:00:00Zhttps://www.mdpi.com/2071-1050/13/22/12443https://doaj.org/toc/2071-1050In general, the long-term maintenance planning of residential buildings is performed based on uniform repair times. However, in fact, various factors, such as the quality and user patterns, affect the performance of residential building components in the Operation and Maintenance (O&M) phase. Hence, various residential building components are repaired at uncertain times, acting as a risk for the residential building maintenance plan. Therefore, an efficient maintenance plan should be established considering maintenance uncertainty. In this regard, this study aims to analyze the uncertainty of repair times for various finishing works in residential buildings based on a probabilistic methodology and outline the implications for the establishment of efficient maintenance strategies in these buildings. Hence, 47,344 repair data for 63 buildings in 12 public residential building complexes completed between 1991 and 2001 in the Republic of Korea were used for analysis. Before the analysis, a repair time matrix was constructed by classifying the finishing works in 25 types and setting service life times to 6–26 years. The repair time distribution for each finishing work was then derived. Results confirmed that basic repair time setting can be performed and various information for reasonable maintenance decision making regarding each finishing work can be provided through a probabilistic approach. The probabilistic approach can be used as a critical decision-making method because there is uncertainty associated with the repair time of each finishing work owing to the performance degradations of various finishing works due to complex causes. Although this study focused on repair time owing to data collection limitations, maintenance strategies with strategic flexibility can be established by developing probabilistic methods that simultaneously consider frequency and cost by securing additional high-quality cost data.Youngduk ChoSanghyo LeeJoosung LeeJaejun KimMDPI AGarticleresidential buildingfinishing workrepair time distributionmaintenance strategyMonte-Carlo simulationuncertaintyEnvironmental effects of industries and plantsTD194-195Renewable energy sourcesTJ807-830Environmental sciencesGE1-350ENSustainability, Vol 13, Iss 12443, p 12443 (2021)
institution DOAJ
collection DOAJ
language EN
topic residential building
finishing work
repair time distribution
maintenance strategy
Monte-Carlo simulation
uncertainty
Environmental effects of industries and plants
TD194-195
Renewable energy sources
TJ807-830
Environmental sciences
GE1-350
spellingShingle residential building
finishing work
repair time distribution
maintenance strategy
Monte-Carlo simulation
uncertainty
Environmental effects of industries and plants
TD194-195
Renewable energy sources
TJ807-830
Environmental sciences
GE1-350
Youngduk Cho
Sanghyo Lee
Joosung Lee
Jaejun Kim
Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies
description In general, the long-term maintenance planning of residential buildings is performed based on uniform repair times. However, in fact, various factors, such as the quality and user patterns, affect the performance of residential building components in the Operation and Maintenance (O&M) phase. Hence, various residential building components are repaired at uncertain times, acting as a risk for the residential building maintenance plan. Therefore, an efficient maintenance plan should be established considering maintenance uncertainty. In this regard, this study aims to analyze the uncertainty of repair times for various finishing works in residential buildings based on a probabilistic methodology and outline the implications for the establishment of efficient maintenance strategies in these buildings. Hence, 47,344 repair data for 63 buildings in 12 public residential building complexes completed between 1991 and 2001 in the Republic of Korea were used for analysis. Before the analysis, a repair time matrix was constructed by classifying the finishing works in 25 types and setting service life times to 6–26 years. The repair time distribution for each finishing work was then derived. Results confirmed that basic repair time setting can be performed and various information for reasonable maintenance decision making regarding each finishing work can be provided through a probabilistic approach. The probabilistic approach can be used as a critical decision-making method because there is uncertainty associated with the repair time of each finishing work owing to the performance degradations of various finishing works due to complex causes. Although this study focused on repair time owing to data collection limitations, maintenance strategies with strategic flexibility can be established by developing probabilistic methods that simultaneously consider frequency and cost by securing additional high-quality cost data.
format article
author Youngduk Cho
Sanghyo Lee
Joosung Lee
Jaejun Kim
author_facet Youngduk Cho
Sanghyo Lee
Joosung Lee
Jaejun Kim
author_sort Youngduk Cho
title Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies
title_short Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies
title_full Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies
title_fullStr Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies
title_full_unstemmed Analysis of the Repair Time of Finishing Works Using a Probabilistic Approach for Efficient Residential Buildings Maintenance Strategies
title_sort analysis of the repair time of finishing works using a probabilistic approach for efficient residential buildings maintenance strategies
publisher MDPI AG
publishDate 2021
url https://doaj.org/article/9ef67a04faf2466b888785061f3c9d09
work_keys_str_mv AT youngdukcho analysisoftherepairtimeoffinishingworksusingaprobabilisticapproachforefficientresidentialbuildingsmaintenancestrategies
AT sanghyolee analysisoftherepairtimeoffinishingworksusingaprobabilisticapproachforefficientresidentialbuildingsmaintenancestrategies
AT joosunglee analysisoftherepairtimeoffinishingworksusingaprobabilisticapproachforefficientresidentialbuildingsmaintenancestrategies
AT jaejunkim analysisoftherepairtimeoffinishingworksusingaprobabilisticapproachforefficientresidentialbuildingsmaintenancestrategies
_version_ 1718410421632761856