OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)

Abstract: Construction projects can be completed successfully based on careful planning. However, in the implementation of the West Amlapura Market development project, it requires an additional 50 calendar days to complete the work where the project is delayed by 24.468% in the 20th week with the r...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Anak Agung Diah Parami Dewi, Anak Agung Gede Agung Yana, Kadek Yasasi Dwinanjaya
Formato: article
Lenguaje:ID
Publicado: Universitas Udayana 2021
Materias:
Acceso en línea:https://doaj.org/article/a365c83b24a9493db7005942c2e2f17e
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:a365c83b24a9493db7005942c2e2f17e
record_format dspace
spelling oai:doaj.org-article:a365c83b24a9493db7005942c2e2f17e2021-11-28T13:27:41ZOPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)1411-12922541-5484https://doaj.org/article/a365c83b24a9493db7005942c2e2f17e2021-04-01T00:00:00Zhttps://ojs.unud.ac.id/index.php/jits/article/view/70911https://doaj.org/toc/1411-1292https://doaj.org/toc/2541-5484Abstract: Construction projects can be completed successfully based on careful planning. However, in the implementation of the West Amlapura Market development project, it requires an additional 50 calendar days to complete the work where the project is delayed by 24.468% in the 20th week with the remaining approximately one month deadline for working days, due to some constraints at the initial stage or determination zero point building level, mobility of tools and materials that hinder and limited Human Resources. Delays in work on the West Amlapura Market development project can be anticipated by accelerating the implementation of the project, with the hope that costs will be minimal while still paying attention to the established quality standards. This study aims to analyze the optimum time and cost by adding labor. This study uses the Least Cost Analysis method which aims to obtain the optimal project duration with the minimum total project cost calculated from activities that have the lowest cost slope. The data required in this study are secondary data in the form of a Budget Plan (RAB), Time Schedule and a List of Unit Price Analysis obtained from the contractor. Based on the calculation of the least cost analysis with the addition of optimum compression labor, it is found that the reduction in the duration of completion is 52 days from a late time of 133 days to 81 days with a total cost of Rp. 11,759,553,889, direct costs of Rp. 11,481,213,347 and indirect costs of Rp. Rp. 278,340,542, -Anak Agung Diah Parami DewiAnak Agung Gede Agung YanaKadek Yasasi DwinanjayaUniversitas UdayanaarticleEngineering (General). Civil engineering (General)TA1-2040IDJurnal Ilmiah Teknik Sipil, Pp 168-174 (2021)
institution DOAJ
collection DOAJ
language ID
topic Engineering (General). Civil engineering (General)
TA1-2040
spellingShingle Engineering (General). Civil engineering (General)
TA1-2040
Anak Agung Diah Parami Dewi
Anak Agung Gede Agung Yana
Kadek Yasasi Dwinanjaya
OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
description Abstract: Construction projects can be completed successfully based on careful planning. However, in the implementation of the West Amlapura Market development project, it requires an additional 50 calendar days to complete the work where the project is delayed by 24.468% in the 20th week with the remaining approximately one month deadline for working days, due to some constraints at the initial stage or determination zero point building level, mobility of tools and materials that hinder and limited Human Resources. Delays in work on the West Amlapura Market development project can be anticipated by accelerating the implementation of the project, with the hope that costs will be minimal while still paying attention to the established quality standards. This study aims to analyze the optimum time and cost by adding labor. This study uses the Least Cost Analysis method which aims to obtain the optimal project duration with the minimum total project cost calculated from activities that have the lowest cost slope. The data required in this study are secondary data in the form of a Budget Plan (RAB), Time Schedule and a List of Unit Price Analysis obtained from the contractor. Based on the calculation of the least cost analysis with the addition of optimum compression labor, it is found that the reduction in the duration of completion is 52 days from a late time of 133 days to 81 days with a total cost of Rp. 11,759,553,889, direct costs of Rp. 11,481,213,347 and indirect costs of Rp. Rp. 278,340,542, -
format article
author Anak Agung Diah Parami Dewi
Anak Agung Gede Agung Yana
Kadek Yasasi Dwinanjaya
author_facet Anak Agung Diah Parami Dewi
Anak Agung Gede Agung Yana
Kadek Yasasi Dwinanjaya
author_sort Anak Agung Diah Parami Dewi
title OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_short OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_full OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_fullStr OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_full_unstemmed OPTIMALISASI WAKTU DAN BIAYA PELAKSANAAN PROYEK MENGGUNAKAN METODE LEAST COST ANALYSIS (Studi Kasus : Pembangunan Pasar Amlapura Barat)
title_sort optimalisasi waktu dan biaya pelaksanaan proyek menggunakan metode least cost analysis (studi kasus : pembangunan pasar amlapura barat)
publisher Universitas Udayana
publishDate 2021
url https://doaj.org/article/a365c83b24a9493db7005942c2e2f17e
work_keys_str_mv AT anakagungdiahparamidewi optimalisasiwaktudanbiayapelaksanaanproyekmenggunakanmetodeleastcostanalysisstudikasuspembangunanpasaramlapurabarat
AT anakagunggedeagungyana optimalisasiwaktudanbiayapelaksanaanproyekmenggunakanmetodeleastcostanalysisstudikasuspembangunanpasaramlapurabarat
AT kadekyasasidwinanjaya optimalisasiwaktudanbiayapelaksanaanproyekmenggunakanmetodeleastcostanalysisstudikasuspembangunanpasaramlapurabarat
_version_ 1718407849519874048