Identification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method

Due to the increase in urban life (especially Tehran) and environmental problems, there is a great need to implement urban sewerage projects. One of the most important things about these kinds of projects is risk management. In this study, at first we reviewed similar projects and interviewed expert...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Farhang Maraghi, Armin Monirabbasi
Formato: article
Lenguaje:EN
FA
Publicado: Water and Wastewater Consulting Engineers Research Development 2021
Materias:
anp
T
Acceso en línea:https://doaj.org/article/a5ce885d5cf64dbab2893e16367bb650
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:a5ce885d5cf64dbab2893e16367bb650
record_format dspace
spelling oai:doaj.org-article:a5ce885d5cf64dbab2893e16367bb6502021-11-20T08:16:50ZIdentification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method1024-59362383-090510.22093/wwj.2021.260344.3089https://doaj.org/article/a5ce885d5cf64dbab2893e16367bb6502021-10-01T00:00:00Zhttp://www.wwjournal.ir/article_135781_72b3475e35222c2adb39936852961766.pdfhttps://doaj.org/toc/1024-5936https://doaj.org/toc/2383-0905Due to the increase in urban life (especially Tehran) and environmental problems, there is a great need to implement urban sewerage projects. One of the most important things about these kinds of projects is risk management. In this study, at first we reviewed similar projects and interviewed experts to identify project risk. Then we analyzed them in two methods, Analytical Network Process and FUZZY VIKOR. Prioritized risks were very similar in both methods. In ANP method, each risk was ranked but in FUZZY VIKOR method, some of the risks that were slightly different were ranked in the same category. Risks such as delays in paying bills, delays in issuing municipal permits, and other high-ranking risks need to be planned and managed. The risk of delay in payment of status statements with the ideal value of 1 in the ANP method and also with the minimum values of S, R, Q 0.011,0.011,-0.032 respectively, in the FUZZY VIKOR method, ranked first in both methods. It should be noted that the risks were identified and rated at the time of writing this paper. There are some suggestions and advice at the end.Farhang MaraghiArmin MonirabbasiWater and Wastewater Consulting Engineers Research Developmentarticlefuzzy vikoranprisk identificationqualitative analysissewerage networkTechnologyTWater supply for domestic and industrial purposesTD201-500Sewage collection and disposal systems. SewerageTD511-780ENFAآب و فاضلاب, Vol 32, Iss 4, Pp 34-46 (2021)
institution DOAJ
collection DOAJ
language EN
FA
topic fuzzy vikor
anp
risk identification
qualitative analysis
sewerage network
Technology
T
Water supply for domestic and industrial purposes
TD201-500
Sewage collection and disposal systems. Sewerage
TD511-780
spellingShingle fuzzy vikor
anp
risk identification
qualitative analysis
sewerage network
Technology
T
Water supply for domestic and industrial purposes
TD201-500
Sewage collection and disposal systems. Sewerage
TD511-780
Farhang Maraghi
Armin Monirabbasi
Identification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method
description Due to the increase in urban life (especially Tehran) and environmental problems, there is a great need to implement urban sewerage projects. One of the most important things about these kinds of projects is risk management. In this study, at first we reviewed similar projects and interviewed experts to identify project risk. Then we analyzed them in two methods, Analytical Network Process and FUZZY VIKOR. Prioritized risks were very similar in both methods. In ANP method, each risk was ranked but in FUZZY VIKOR method, some of the risks that were slightly different were ranked in the same category. Risks such as delays in paying bills, delays in issuing municipal permits, and other high-ranking risks need to be planned and managed. The risk of delay in payment of status statements with the ideal value of 1 in the ANP method and also with the minimum values of S, R, Q 0.011,0.011,-0.032 respectively, in the FUZZY VIKOR method, ranked first in both methods. It should be noted that the risks were identified and rated at the time of writing this paper. There are some suggestions and advice at the end.
format article
author Farhang Maraghi
Armin Monirabbasi
author_facet Farhang Maraghi
Armin Monirabbasi
author_sort Farhang Maraghi
title Identification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method
title_short Identification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method
title_full Identification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method
title_fullStr Identification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method
title_full_unstemmed Identification and Qualitative Risks Analysis of Project Tehran Sewerage Network by ANP Method and Comparison with FUZZY VIKOR Method
title_sort identification and qualitative risks analysis of project tehran sewerage network by anp method and comparison with fuzzy vikor method
publisher Water and Wastewater Consulting Engineers Research Development
publishDate 2021
url https://doaj.org/article/a5ce885d5cf64dbab2893e16367bb650
work_keys_str_mv AT farhangmaraghi identificationandqualitativerisksanalysisofprojecttehranseweragenetworkbyanpmethodandcomparisonwithfuzzyvikormethod
AT arminmonirabbasi identificationandqualitativerisksanalysisofprojecttehranseweragenetworkbyanpmethodandcomparisonwithfuzzyvikormethod
_version_ 1718419500219498496