Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem
Project planning and scheduling are one of the most important issues in construction engineering and management. It is being crucial to progress developed countries. One of the major challenges in construction project management is time and cost management. The traditional view lonely is not able to...
Guardado en:
Autores principales: | , , , |
---|---|
Formato: | article |
Lenguaje: | FA |
Publicado: |
Iranian Society of Structrual Engineering (ISSE)
2019
|
Materias: | |
Acceso en línea: | https://doaj.org/article/ad6f4ff119874c1ba9d84f3250b4103e |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:ad6f4ff119874c1ba9d84f3250b4103e |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:ad6f4ff119874c1ba9d84f3250b4103e2021-11-08T15:52:22ZPresentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem2476-39772538-261610.22065/jsce.2018.104864.1377https://doaj.org/article/ad6f4ff119874c1ba9d84f3250b4103e2019-11-01T00:00:00Zhttps://www.jsce.ir/article_61069_9fb1610845a35bb15ede2d8e2ccf4331.pdfhttps://doaj.org/toc/2476-3977https://doaj.org/toc/2538-2616Project planning and scheduling are one of the most important issues in construction engineering and management. It is being crucial to progress developed countries. One of the major challenges in construction project management is time and cost management. The traditional view lonely is not able to meet the needs of this field. Therefore, the use of modern management approaches can be greatly helpful. Time and cost are among the important objectives of each project. Cost and time trade-off is among the major important issues in projects planning and control and the main of solving this problem is actually analysis of interaction of different types of project costs and time of the project. In this paper, a time and cost trade off project scheduling problem under budget constraint is studied. For this purpose, a meta-heuristic genetic algorithm is developed to find the optimal solution in MATLAB. Completion time sensitivity analysis is done according to different budget level. In order to validate proposed algorithm, problem is solved by GAMS and the outputs between them are compared. The results show that proposed meta heuristic algorithm is able to solve problem optimally so that differences between samples solution were zero in different budget level.ایرج مهدویMilad HemmatianMohammad Javad Taheri AmiriOmid GhenaatIranian Society of Structrual Engineering (ISSE)articleconstruction engineering and managementproject managementtime and cost managementmetaheurestic algorithmbudget constraintBridge engineeringTG1-470Building constructionTH1-9745FAJournal of Structural and Construction Engineering, Vol 6, Iss شماره 3, Pp 41-56 (2019) |
institution |
DOAJ |
collection |
DOAJ |
language |
FA |
topic |
construction engineering and management project management time and cost management metaheurestic algorithm budget constraint Bridge engineering TG1-470 Building construction TH1-9745 |
spellingShingle |
construction engineering and management project management time and cost management metaheurestic algorithm budget constraint Bridge engineering TG1-470 Building construction TH1-9745 ایرج مهدوی Milad Hemmatian Mohammad Javad Taheri Amiri Omid Ghenaat Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem |
description |
Project planning and scheduling are one of the most important issues in construction engineering and management. It is being crucial to progress developed countries. One of the major challenges in construction project management is time and cost management. The traditional view lonely is not able to meet the needs of this field. Therefore, the use of modern management approaches can be greatly helpful. Time and cost are among the important objectives of each project. Cost and time trade-off is among the major important issues in projects planning and control and the main of solving this problem is actually analysis of interaction of different types of project costs and time of the project. In this paper, a time and cost trade off project scheduling problem under budget constraint is studied. For this purpose, a meta-heuristic genetic algorithm is developed to find the optimal solution in MATLAB. Completion time sensitivity analysis is done according to different budget level. In order to validate proposed algorithm, problem is solved by GAMS and the outputs between them are compared. The results show that proposed meta heuristic algorithm is able to solve problem optimally so that differences between samples solution were zero in different budget level. |
format |
article |
author |
ایرج مهدوی Milad Hemmatian Mohammad Javad Taheri Amiri Omid Ghenaat |
author_facet |
ایرج مهدوی Milad Hemmatian Mohammad Javad Taheri Amiri Omid Ghenaat |
author_sort |
ایرج مهدوی |
title |
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem |
title_short |
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem |
title_full |
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem |
title_fullStr |
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem |
title_full_unstemmed |
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem |
title_sort |
presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem |
publisher |
Iranian Society of Structrual Engineering (ISSE) |
publishDate |
2019 |
url |
https://doaj.org/article/ad6f4ff119874c1ba9d84f3250b4103e |
work_keys_str_mv |
AT ạyrjmhdwy presentationofexactandmetaheuresticsolutionmethodforminimizationprojectcompletiontimewithconsideringbudgetconstraintproblem AT miladhemmatian presentationofexactandmetaheuresticsolutionmethodforminimizationprojectcompletiontimewithconsideringbudgetconstraintproblem AT mohammadjavadtaheriamiri presentationofexactandmetaheuresticsolutionmethodforminimizationprojectcompletiontimewithconsideringbudgetconstraintproblem AT omidghenaat presentationofexactandmetaheuresticsolutionmethodforminimizationprojectcompletiontimewithconsideringbudgetconstraintproblem |
_version_ |
1718441693286498304 |