Realization of large energy proportion in the central lobe by coherent beam combination based on conformal projection system
Abstract In this paper, we experimentally validate a tiled-aperture conformal projection system with the largest array filling factor and element beam truncation factor to the best of our knowledge. The conformal projection system, which is made up of a hexagonal adaptive fiber-optics collimator (AF...
Guardado en:
Autores principales: | Dong Zhi, Zhixin Zhang, Yanxing Ma, Xiaolin Wang, Zilun Chen, Wuming Wu, Pu Zhou, Lei Si |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Nature Portfolio
2017
|
Materias: | |
Acceso en línea: | https://doaj.org/article/aef1344857c04214962d3197254929fe |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
PROJECT FINANCE MECHANISM FOR INVESTMENT PROJECT REALIZATION
por: V. V. Pereverzeva
Publicado: (2018) -
Enhanced Efficiency and Reduced Side Lobe Level Convex Conformal Reflectarray
por: Michele Beccaria, et al.
Publicado: (2021) -
Coherent combining of self-cleaned multimode beams
por: Marc Fabert, et al.
Publicado: (2020) -
Conformity Assessment as a Tool for Organizational Learning in Large Engineering and Construction Projects
por: Assalim,Luciano, et al.
Publicado: (2013) -
Successful Realization of the Slovenian-Serbian Bilateral Project
por: Ljubica Milosavljević
Publicado: (2016)