ANALISIS ESTIMASI COST-VOLUME-PROFIT (CVP) DALAM HUBUNGANNYA DENGAN PERENCANAAN LABA PADA HOTEL TLOGO MAS SARANGAN

This research aims to analyze the estimated Cost-Volume-Profit (CVP) in association with the Profit Planning at Tlogo Mas Hotel Sarangan. Analytical techniques used in this study were: (1) Classify all costs incurred in the variable costs (variable costs) and fixed costs (fixed cost). (2) Method of...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autor principal: Satrijo Budi Wibowo
Formato: article
Lenguaje:EN
ID
Publicado: Universitas PGRI Madiun 2012
Materias:
L
Acceso en línea:https://doaj.org/article/b2c9d02f568c4b45b3018a3b78c8e31e
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Descripción
Sumario:This research aims to analyze the estimated Cost-Volume-Profit (CVP) in association with the Profit Planning at Tlogo Mas Hotel Sarangan. Analytical techniques used in this study were: (1) Classify all costs incurred in the variable costs (variable costs) and fixed costs (fixed cost). (2) Method of least squares analysis. (3) Analysis of the breakeven point (Break Event Point / BEP). The results showed that Tlogo Mas Hotel Sarangan determine the profits of 10% of total sales. It is seen from the fluctuations experienced profit growth each year from 2009 to 2011.