ANALISIS ESTIMASI COST-VOLUME-PROFIT (CVP) DALAM HUBUNGANNYA DENGAN PERENCANAAN LABA PADA HOTEL TLOGO MAS SARANGAN

This research aims to analyze the estimated Cost-Volume-Profit (CVP) in association with the Profit Planning at Tlogo Mas Hotel Sarangan. Analytical techniques used in this study were: (1) Classify all costs incurred in the variable costs (variable costs) and fixed costs (fixed cost). (2) Method of...

Full description

Saved in:
Bibliographic Details
Main Author: Satrijo Budi Wibowo
Format: article
Language:EN
ID
Published: Universitas PGRI Madiun 2012
Subjects:
L
Online Access:https://doaj.org/article/b2c9d02f568c4b45b3018a3b78c8e31e
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This research aims to analyze the estimated Cost-Volume-Profit (CVP) in association with the Profit Planning at Tlogo Mas Hotel Sarangan. Analytical techniques used in this study were: (1) Classify all costs incurred in the variable costs (variable costs) and fixed costs (fixed cost). (2) Method of least squares analysis. (3) Analysis of the breakeven point (Break Event Point / BEP). The results showed that Tlogo Mas Hotel Sarangan determine the profits of 10% of total sales. It is seen from the fluctuations experienced profit growth each year from 2009 to 2011.