Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road

Tunnel 3 of the Sigli Banda Aceh Toll Road has been designed based on several site investigations. The site investigations have not included surface geological investigations. Subsurface geological investigations have been carried out but with less detailed drill core evaluation. This will cause les...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Latif Hanif Khoirul, Husein Salahuddin, Indrawan I Gde Budi
Formato: article
Lenguaje:EN
FR
Publicado: EDP Sciences 2021
Materias:
Acceso en línea:https://doaj.org/article/b506b2abd1764723ab15d74a8ee9afe9
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:b506b2abd1764723ab15d74a8ee9afe9
record_format dspace
spelling oai:doaj.org-article:b506b2abd1764723ab15d74a8ee9afe92021-12-02T17:11:56ZGeological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road2267-124210.1051/e3sconf/202132502004https://doaj.org/article/b506b2abd1764723ab15d74a8ee9afe92021-01-01T00:00:00Zhttps://www.e3s-conferences.org/articles/e3sconf/pdf/2021/101/e3sconf_icst2021_02004.pdfhttps://doaj.org/toc/2267-1242Tunnel 3 of the Sigli Banda Aceh Toll Road has been designed based on several site investigations. The site investigations have not included surface geological investigations. Subsurface geological investigations have been carried out but with less detailed drill core evaluation. This will cause less accuracy on the assessed tunnel stand-up time. This research aims to evaluate the engineering geological conditions at the tunnel construction site by conducting geological mapping with 1:5,000 scale and re-evaluating drill core using RMR89 method more thoroughly so that it can produce more accurate assessment of the tunnel stand-up time. The geological mapping result shows that the research area has three rock units, namely lapili, tuffaceous sandstones, and interbedded sandstone-siltstones, with moderate to fresh weathering degree. The drill core evaluation shows that research area has poor to good rock mass classes (34 – 67). The drill core evaluation results also indicate possible geological structures that may influence subsurface rock mass strength. The tunnel stand-up time obtained from the lowest RMR89 value for each drill core shows a value of 5 - 90 hours, implying immediate application of support system after tunnel excavation.Latif Hanif KhoirulHusein SalahuddinIndrawan I Gde BudiEDP SciencesarticleEnvironmental sciencesGE1-350ENFRE3S Web of Conferences, Vol 325, p 02004 (2021)
institution DOAJ
collection DOAJ
language EN
FR
topic Environmental sciences
GE1-350
spellingShingle Environmental sciences
GE1-350
Latif Hanif Khoirul
Husein Salahuddin
Indrawan I Gde Budi
Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road
description Tunnel 3 of the Sigli Banda Aceh Toll Road has been designed based on several site investigations. The site investigations have not included surface geological investigations. Subsurface geological investigations have been carried out but with less detailed drill core evaluation. This will cause less accuracy on the assessed tunnel stand-up time. This research aims to evaluate the engineering geological conditions at the tunnel construction site by conducting geological mapping with 1:5,000 scale and re-evaluating drill core using RMR89 method more thoroughly so that it can produce more accurate assessment of the tunnel stand-up time. The geological mapping result shows that the research area has three rock units, namely lapili, tuffaceous sandstones, and interbedded sandstone-siltstones, with moderate to fresh weathering degree. The drill core evaluation shows that research area has poor to good rock mass classes (34 – 67). The drill core evaluation results also indicate possible geological structures that may influence subsurface rock mass strength. The tunnel stand-up time obtained from the lowest RMR89 value for each drill core shows a value of 5 - 90 hours, implying immediate application of support system after tunnel excavation.
format article
author Latif Hanif Khoirul
Husein Salahuddin
Indrawan I Gde Budi
author_facet Latif Hanif Khoirul
Husein Salahuddin
Indrawan I Gde Budi
author_sort Latif Hanif Khoirul
title Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road
title_short Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road
title_full Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road
title_fullStr Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road
title_full_unstemmed Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road
title_sort geological mapping and stand-up time estimation based on core drill evaluation using rmr89 on tunnel 3 sigli banda aceh toll road
publisher EDP Sciences
publishDate 2021
url https://doaj.org/article/b506b2abd1764723ab15d74a8ee9afe9
work_keys_str_mv AT latifhanifkhoirul geologicalmappingandstanduptimeestimationbasedoncoredrillevaluationusingrmr89ontunnel3siglibandaacehtollroad
AT huseinsalahuddin geologicalmappingandstanduptimeestimationbasedoncoredrillevaluationusingrmr89ontunnel3siglibandaacehtollroad
AT indrawanigdebudi geologicalmappingandstanduptimeestimationbasedoncoredrillevaluationusingrmr89ontunnel3siglibandaacehtollroad
_version_ 1718381457478516736