Geological mapping and stand-up time estimation based on core drill evaluation using RMR89 on Tunnel 3 Sigli Banda Aceh Toll Road
Tunnel 3 of the Sigli Banda Aceh Toll Road has been designed based on several site investigations. The site investigations have not included surface geological investigations. Subsurface geological investigations have been carried out but with less detailed drill core evaluation. This will cause les...
Enregistré dans:
Auteurs principaux: | , , |
---|---|
Format: | article |
Langue: | EN FR |
Publié: |
EDP Sciences
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/b506b2abd1764723ab15d74a8ee9afe9 |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|