Temperature Control Technology for Construction of Jinsha River Bridge
The key problem of mass concrete temperature control is to effectively control the maximum temperature inside concrete, the temperature difference between inside and outside concrete, and the temperature difference between surface and environment. The size of the main tower cap of No. 3 Jinsha River...
Guardado en:
Autores principales: | Hui-Wu Jin, Guo-An Wang, Zhan-Ming Chen |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
Hindawi Limited
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/b88afdc689d44ea1b5de00de0cac2025 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Early Warning for the Construction Safety Risk of Bridge Projects Using a RS-SSA-LSSVM Model
por: Gang Li, et al.
Publicado: (2021) -
Development of Construction and Repair Materials Used in Transport and Technological Machines Operating in the Arctic
por: Kosenko Ekaterina, et al.
Publicado: (2021) -
An Experimental Study on a Composite Bonding Structure for Steel Bridge Deck Pavements
por: Xiaoguang Zheng, et al.
Publicado: (2021) -
Experimental Study on Static Performance of Deployable Bridge Based on Cable-Strengthened Scissor Structures
por: Xiaoming Yu, et al.
Publicado: (2021) -
Realization of the Ultrasonic Motor Speed Control System Based on H-Bridge
por: Tan Jiawan, et al.
Publicado: (2021)