Providing a crisis management model to design a disaster relief building based on BIM and AHP method
The goal of this research is to identify and evaluate the factors of design excellence based on building information modeling (BIM) compared to the traditional method in relief structures including fire station centers and hospitals with an emphasis on crisis reduction. For this purpose, by studying...
Guardado en:
Autores principales: | Soodabeh Valizadeh, Ali Parvari |
---|---|
Formato: | article |
Lenguaje: | FA |
Publicado: |
Iranian Society of Structrual Engineering (ISSE)
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/ba310290cc27428883a4bb3e91ee1b64 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
por: Seyed Morteza Hatefi, et al.
Publicado: (2019) -
Evaluating and prioritizing the risks of BOT projects using structural equations and integrated model of fuzzy AHP and fuzzy TOPSIS
por: Seyed Morteza Hatefi, et al.
Publicado: (2019) -
Understanding the effects of BIM implementation in corporation finance: An empirical study in China
por: Wang Zhimin, et al.
Publicado: (2021) -
Study and prioritize the obstacles and challenges of risk management in building projects with public-private partnerships using Fuzzy FMEA
por: Ali Parvari, et al.
Publicado: (2021) -
The Behavior of Core Wall in Tall Buildings Capable of Two Hinges
por: Hamid beiraghi, et al.
Publicado: (2015)