Simple numerical calculation method of flow velocity on roof of train running in tunnel
A pantograph mounted on a high-speed train roof is exposed to high-speed air flow while traveling, and lift force is generated in the pantograph. To ensure high current collecting performance of the pantograph, it is important to appropriately adjust the lift force generated in the pantograph. The f...
Guardado en:
Autores principales: | Katsuhiro KIKUCHI, Yuhei NOGUCHI, Koji NAKADE, Shinya MASHIMO |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
The Japan Society of Mechanical Engineers
2018
|
Materias: | |
Acceso en línea: | https://doaj.org/article/bd09445ce0fc4f5ba7ebfb6d9e7e1a64 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Analysis of flow velocity fluctuation around a train model running in a tunnel using restored waveforms
por: Katsuhiro KIKUCHI, et al.
Publicado: (2021) -
Effects of Running Speed on Coupling between Pantograph of High-Speed Train and Tunnel Based on Aerodynamics and Multi-Body Dynamics Coupling
por: Zhanling Ji, et al.
Publicado: (2021) -
Aerodynamic noise evaluation for Aeolian tone and acoustical insulating plate by similarity law
por: Akitoshi MATSUI, et al.
Publicado: (2020) -
Cool Roofs in the US: The Impact of Roof Reflectivity, Insulation and Attachment Method on Annual Energy Cost
por: Athanasios Tzempelikos, et al.
Publicado: (2021) - World tunnelling and subsurface excavation