Implementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool

Currently, when machining gears, the main problem arises - the resistance of a standard worm mill. In the current conditions of sanctions, import substitution and the launch of the State program for the development of its own metal cutting tool designs by tool companies, the creation of prefabricate...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Artamonov E.V., Kireev V.V., Zyryanov V.A.
Formato: article
Lenguaje:EN
FR
Publicado: EDP Sciences 2021
Materias:
Acceso en línea:https://doaj.org/article/c57bd8589f2c4b749b12cecff556e756
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:c57bd8589f2c4b749b12cecff556e756
record_format dspace
spelling oai:doaj.org-article:c57bd8589f2c4b749b12cecff556e7562021-11-08T15:20:43ZImplementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool2261-236X10.1051/matecconf/202134601003https://doaj.org/article/c57bd8589f2c4b749b12cecff556e7562021-01-01T00:00:00Zhttps://www.matec-conferences.org/articles/matecconf/pdf/2021/15/matecconf_icmtmte2021_01003.pdfhttps://doaj.org/toc/2261-236XCurrently, when machining gears, the main problem arises - the resistance of a standard worm mill. In the current conditions of sanctions, import substitution and the launch of the State program for the development of its own metal cutting tool designs by tool companies, the creation of prefabricated structures can be considered a promising and effective solution, since this has been repeatedly confirmed by leading Russian researchers [1-8].Artamonov E.V.Kireev V.V.Zyryanov V.A.EDP SciencesarticleEngineering (General). Civil engineering (General)TA1-2040ENFRMATEC Web of Conferences, Vol 346, p 01003 (2021)
institution DOAJ
collection DOAJ
language EN
FR
topic Engineering (General). Civil engineering (General)
TA1-2040
spellingShingle Engineering (General). Civil engineering (General)
TA1-2040
Artamonov E.V.
Kireev V.V.
Zyryanov V.A.
Implementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool
description Currently, when machining gears, the main problem arises - the resistance of a standard worm mill. In the current conditions of sanctions, import substitution and the launch of the State program for the development of its own metal cutting tool designs by tool companies, the creation of prefabricated structures can be considered a promising and effective solution, since this has been repeatedly confirmed by leading Russian researchers [1-8].
format article
author Artamonov E.V.
Kireev V.V.
Zyryanov V.A.
author_facet Artamonov E.V.
Kireev V.V.
Zyryanov V.A.
author_sort Artamonov E.V.
title Implementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool
title_short Implementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool
title_full Implementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool
title_fullStr Implementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool
title_full_unstemmed Implementation of a Group Cutting Scheme during Processing of Large-Module Gears with a Prefabricated Tool
title_sort implementation of a group cutting scheme during processing of large-module gears with a prefabricated tool
publisher EDP Sciences
publishDate 2021
url https://doaj.org/article/c57bd8589f2c4b749b12cecff556e756
work_keys_str_mv AT artamonovev implementationofagroupcuttingschemeduringprocessingoflargemodulegearswithaprefabricatedtool
AT kireevvv implementationofagroupcuttingschemeduringprocessingoflargemodulegearswithaprefabricatedtool
AT zyryanovva implementationofagroupcuttingschemeduringprocessingoflargemodulegearswithaprefabricatedtool
_version_ 1718441793845985280