Influence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast

In order to optimize the arrangement of cutting holes in tunnel blast in Dahongshan Copper Mine, theoretical analysis and numerical simulation were combined to preliminarily determine the diameter of the hollow hole and the distance between the charge hole and the hollow hole during cut blast, which...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Xianglong Li, Qiang Li, Jianguo Wang, Zichen Wang, Hao Wang, Zihao Tao
Formato: article
Lenguaje:EN
Publicado: Hindawi-Wiley 2021
Materias:
Acceso en línea:https://doaj.org/article/cfb304e3674740e482a3283b0106e19a
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:cfb304e3674740e482a3283b0106e19a
record_format dspace
spelling oai:doaj.org-article:cfb304e3674740e482a3283b0106e19a2021-11-22T01:11:17ZInfluence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast1468-812310.1155/2021/9080560https://doaj.org/article/cfb304e3674740e482a3283b0106e19a2021-01-01T00:00:00Zhttp://dx.doi.org/10.1155/2021/9080560https://doaj.org/toc/1468-8123In order to optimize the arrangement of cutting holes in tunnel blast in Dahongshan Copper Mine, theoretical analysis and numerical simulation were combined to preliminarily determine the diameter of the hollow hole and the distance between the charge hole and the hollow hole during cut blast, which was verified through the field blast test. The research results show that with the increase of the hole diameter, the peak compressive stress of rock surrounding the empty hole gradually decreases, and the peak tensile stress gradually increases, which is consistent with the calculation results; when the hole diameter is 10 cm, the two first blast holes are arranged horizontally and 30 cm from the empty hole, two second blast holes are arranged vertically and 40 cm away from the empty hole, and the four third blast holes are arranged at a horizontal distance of 45 cm and a vertical distance of 45 cm from the empty hole; the contour area in numerical simulation is the maximum. The difference in contour area, contour width, and contour and contour height between the measured value and the simulation result is 5.3%, 3.3%, and 3.4%, respectively, indicating that the combination of theoretical calculation and numerical simulation is suitable for prediction of cavity section after blast in tunnel excavation.Xianglong LiQiang LiJianguo WangZichen WangHao WangZihao TaoHindawi-WileyarticleGeologyQE1-996.5ENGeofluids, Vol 2021 (2021)
institution DOAJ
collection DOAJ
language EN
topic Geology
QE1-996.5
spellingShingle Geology
QE1-996.5
Xianglong Li
Qiang Li
Jianguo Wang
Zichen Wang
Hao Wang
Zihao Tao
Influence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast
description In order to optimize the arrangement of cutting holes in tunnel blast in Dahongshan Copper Mine, theoretical analysis and numerical simulation were combined to preliminarily determine the diameter of the hollow hole and the distance between the charge hole and the hollow hole during cut blast, which was verified through the field blast test. The research results show that with the increase of the hole diameter, the peak compressive stress of rock surrounding the empty hole gradually decreases, and the peak tensile stress gradually increases, which is consistent with the calculation results; when the hole diameter is 10 cm, the two first blast holes are arranged horizontally and 30 cm from the empty hole, two second blast holes are arranged vertically and 40 cm away from the empty hole, and the four third blast holes are arranged at a horizontal distance of 45 cm and a vertical distance of 45 cm from the empty hole; the contour area in numerical simulation is the maximum. The difference in contour area, contour width, and contour and contour height between the measured value and the simulation result is 5.3%, 3.3%, and 3.4%, respectively, indicating that the combination of theoretical calculation and numerical simulation is suitable for prediction of cavity section after blast in tunnel excavation.
format article
author Xianglong Li
Qiang Li
Jianguo Wang
Zichen Wang
Hao Wang
Zihao Tao
author_facet Xianglong Li
Qiang Li
Jianguo Wang
Zichen Wang
Hao Wang
Zihao Tao
author_sort Xianglong Li
title Influence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast
title_short Influence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast
title_full Influence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast
title_fullStr Influence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast
title_full_unstemmed Influence of Hole Arrangement on the Section of Cavity Formed by Cutting Blast
title_sort influence of hole arrangement on the section of cavity formed by cutting blast
publisher Hindawi-Wiley
publishDate 2021
url https://doaj.org/article/cfb304e3674740e482a3283b0106e19a
work_keys_str_mv AT xianglongli influenceofholearrangementonthesectionofcavityformedbycuttingblast
AT qiangli influenceofholearrangementonthesectionofcavityformedbycuttingblast
AT jianguowang influenceofholearrangementonthesectionofcavityformedbycuttingblast
AT zichenwang influenceofholearrangementonthesectionofcavityformedbycuttingblast
AT haowang influenceofholearrangementonthesectionofcavityformedbycuttingblast
AT zihaotao influenceofholearrangementonthesectionofcavityformedbycuttingblast
_version_ 1718418308751949824