Multi-machine energy-aware scheduling

The traditional set of manufacturing scheduling problems concern general and easy-to-measure economic objectives such as makespan and tardiness. The variable nature of energy costs over the course of the day remains mostly ignored by most previous research. This variability should not be considered...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: David Van Den Dooren, Thomas Sys, TúlioA.M. Toffolo, Tony Wauters, Greet Vanden Berghe
Formato: article
Lenguaje:EN
Publicado: Elsevier 2017
Materias:
Acceso en línea:https://doaj.org/article/d0d0b60eb9e5463f965670457972cad3
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Descripción
Sumario:The traditional set of manufacturing scheduling problems concern general and easy-to-measure economic objectives such as makespan and tardiness. The variable nature of energy costs over the course of the day remains mostly ignored by most previous research. This variability should not be considered an added complexity, but rather an opportunity for businesses to minimise their energy bill. More effectively scheduling jobs across multiple machines may result in reduced costs despite fixed consumption levels. To this end, this paper proposes a scheduling approach capable of optimising this largely undefined and, consequently, currently unaddressed situation. The proposed multi-machine energy optimisation approach consists of constructive heuristics responsible for generating an initial solution and a late acceptance hill climbing algorithm responsible for improving this initial solution. The combined approach was applied to the scheduling instances of the ICON challenge on Forecasting and Scheduling [The challenge is organized as part of the EU FET-Open: Inductive Constraint Programming (ICON) project (O’Sullivan et al., ICON challenge on forecasting and scheduling. UCC, University College Cork, ICON, Cork. http://iconchallenge.insight-centre.org/challenge-energy, 2014)] whereupon it was proven superior to all other competing algorithms. This achievement highlights the potential of the proposed algorithm insofar as solving the multi-machine energy-aware optimisation problem (MEOP). The new benchmarks are available for further research.