Laboratory Characterization of Geosynthetics-Reinforced Asphalt Mixture
In order to improve the mechanical properties of asphalt pavement, geosynthetics can be employed in asphalt mixture. This research designed 12 reinforced schemes based on the types of geosynthetics, bonding layers and reinforced position. For the relative tests carried out, reinforced specimens were...
Guardado en:
Autores principales: | , , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/d150e46d021a48af92657fdfbc41e644 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sumario: | In order to improve the mechanical properties of asphalt pavement, geosynthetics can be employed in asphalt mixture. This research designed 12 reinforced schemes based on the types of geosynthetics, bonding layers and reinforced position. For the relative tests carried out, reinforced specimens were prepared according to each individual scheme. Moreover, rutting tests, bending creep tests and split fatigue tests were carried out on reinforced specimens in the laboratory. The results obtained in this investigation showed that the dynamic stability, bending creep rate and fatigue life of geocell-reinforced specimens are better than those of geogrid-reinforced specimens. The bonding layer of Styrene-Butadiene-Styrene (SBS) modified asphalt is better than epoxy modified asphalt. The dynamic stability and fatigue life of middle reinforcement are better than those of the lower reinforcement, while the bending creep rate of the lower reinforcement is better than middle reinforcement. In addition, reinforced scheme (9) has the largest increase in dynamic stability and fatigue life by 103 and 137%, respectively, and reinforced scheme (12) has the largest reduction in bending creep rate by 46%. However, scheme (9) improved dynamic stability and fatigue life by 43 and 29% higher than scheme (12), while the reduction of flexural creep rate of scheme (12) is only 7% higher than that of scheme (9). |
---|