A Refined Load Distribution Method for Large Hydropower Stations With Multiple Units Considering Constraints of Substations
Large hydropower stations often undertake peak regulation tasks during the non-abandoning water season. This requires a reasonable arrangement of unit commitment and load distribution (UCLD). In this study, a load distribution model considering constraints of substations was established, and a novel...
Enregistré dans:
Auteurs principaux: | Xiao Chen, Jianzhong Zhou, Benjun Jia |
---|---|
Format: | article |
Langue: | EN |
Publié: |
IEEE
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/dd3a899b049d4fde9f3fb53209e4d2b2 |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Power system stress analysis for main grid substations in Brazil
par: Duailibe Monteiro,Paulo R, et autres
Publié: (2016) -
A new method for calculating the downstream ecological flow of diversion-type small hydropower stations
par: Zicheng Yu, et autres
Publié: (2021) -
Validation of optimal electric vehicle charging station allotment on IEEE 15-bus system
par: D. Sengupta, et autres
Publié: (2021) -
DIGITAL SUBSTATION COMPONENT SYSTEM "SMART GRID"
par: V.I. Vasilchenko, et autres
Publié: (2014) -
MONITORING OF ELECTRICAL ENERGY QUALITY ON THE TRACTION SUBSTATION INPUT
par: O.G. Gryb, et autres
Publié: (2015)