Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process
Copper losses during the Peirce-Smith converter (PSC) operation is of great concern in the copper smelting process. Two primary objectives of the PSC are to produce blister copper with a shorter batch time and to keep the copper losses at a minimum level. Due to the nature of the process, those two...
Guardado en:
Autores principales: | , , |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/e7e21e4b16864c5ba6b996ab9b49f39c |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:e7e21e4b16864c5ba6b996ab9b49f39c |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:e7e21e4b16864c5ba6b996ab9b49f39c2021-11-25T18:51:24ZOptimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process10.3390/pr91120042227-9717https://doaj.org/article/e7e21e4b16864c5ba6b996ab9b49f39c2021-11-01T00:00:00Zhttps://www.mdpi.com/2227-9717/9/11/2004https://doaj.org/toc/2227-9717Copper losses during the Peirce-Smith converter (PSC) operation is of great concern in the copper smelting process. Two primary objectives of the PSC are to produce blister copper with a shorter batch time and to keep the copper losses at a minimum level. Due to the nature of the process, those two objectives are contradictory to each other. Moreover, actions inside the PSC are subject to several operational constraints that make it difficult to develop a scheduling framework for its optimal operation. In this work, a basic but efficient linear multi-period scheduling framework for the PSC is presented that finds the optimal timings of the PSC operations to keep the copper losses and the batch time at a minimum level. An industrial case study is used to illustrate the effectiveness of the proposed framework. This novel solution can be implemented in other smelting processes and used for the design of an inter-PSC scheduling framework.Hussain AhmedLuis Ricardez-SandovalMatti VilkkoMDPI AGarticlePeirce-Smith convertercopper smeltingcopper losseslinear programmingschedulingoptimizationChemical technologyTP1-1185ChemistryQD1-999ENProcesses, Vol 9, Iss 2004, p 2004 (2021) |
institution |
DOAJ |
collection |
DOAJ |
language |
EN |
topic |
Peirce-Smith converter copper smelting copper losses linear programming scheduling optimization Chemical technology TP1-1185 Chemistry QD1-999 |
spellingShingle |
Peirce-Smith converter copper smelting copper losses linear programming scheduling optimization Chemical technology TP1-1185 Chemistry QD1-999 Hussain Ahmed Luis Ricardez-Sandoval Matti Vilkko Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process |
description |
Copper losses during the Peirce-Smith converter (PSC) operation is of great concern in the copper smelting process. Two primary objectives of the PSC are to produce blister copper with a shorter batch time and to keep the copper losses at a minimum level. Due to the nature of the process, those two objectives are contradictory to each other. Moreover, actions inside the PSC are subject to several operational constraints that make it difficult to develop a scheduling framework for its optimal operation. In this work, a basic but efficient linear multi-period scheduling framework for the PSC is presented that finds the optimal timings of the PSC operations to keep the copper losses and the batch time at a minimum level. An industrial case study is used to illustrate the effectiveness of the proposed framework. This novel solution can be implemented in other smelting processes and used for the design of an inter-PSC scheduling framework. |
format |
article |
author |
Hussain Ahmed Luis Ricardez-Sandoval Matti Vilkko |
author_facet |
Hussain Ahmed Luis Ricardez-Sandoval Matti Vilkko |
author_sort |
Hussain Ahmed |
title |
Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process |
title_short |
Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process |
title_full |
Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process |
title_fullStr |
Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process |
title_full_unstemmed |
Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process |
title_sort |
optimal scheduling of the peirce-smith converter in the copper smelting process |
publisher |
MDPI AG |
publishDate |
2021 |
url |
https://doaj.org/article/e7e21e4b16864c5ba6b996ab9b49f39c |
work_keys_str_mv |
AT hussainahmed optimalschedulingofthepeircesmithconverterinthecoppersmeltingprocess AT luisricardezsandoval optimalschedulingofthepeircesmithconverterinthecoppersmeltingprocess AT mattivilkko optimalschedulingofthepeircesmithconverterinthecoppersmeltingprocess |
_version_ |
1718410684799123456 |