Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process
Copper losses during the Peirce-Smith converter (PSC) operation is of great concern in the copper smelting process. Two primary objectives of the PSC are to produce blister copper with a shorter batch time and to keep the copper losses at a minimum level. Due to the nature of the process, those two...
Guardado en:
Autores principales: | Hussain Ahmed, Luis Ricardez-Sandoval, Matti Vilkko |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
MDPI AG
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/e7e21e4b16864c5ba6b996ab9b49f39c |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Cinética del Soplado a Cobre en un Convertidor Peirce-Smith
por: Carrillo,F., et al.
Publicado: (2004) -
Copper + Tin + People: Public Co-Smelting Experimentation in Northwestern Iberia
por: Aaron Lackinger
Publicado: (2013) -
A MAJOR PREHISPANIC COPPER PRODUCTION CENTER IDENTIFIED AT COLLAHUASI, SOUTHERN TARAPACÁ ALTIPLANO (CHILE)
por: Figueroa,Valentina, et al.
Publicado: (2018) -
ELECTROPOLYMERIZATION OF ANILINE AND PYRROLE IN THE PRESENCE OF COPPER(II)
por: BASÁEZ,L., et al.
Publicado: (2001) -
Continuous copper leaching technology
por: L. I. Mukhortova, et al.
Publicado: (2021)