Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process
Copper losses during the Peirce-Smith converter (PSC) operation is of great concern in the copper smelting process. Two primary objectives of the PSC are to produce blister copper with a shorter batch time and to keep the copper losses at a minimum level. Due to the nature of the process, those two...
Enregistré dans:
Auteurs principaux: | Hussain Ahmed, Luis Ricardez-Sandoval, Matti Vilkko |
---|---|
Format: | article |
Langue: | EN |
Publié: |
MDPI AG
2021
|
Sujets: | |
Accès en ligne: | https://doaj.org/article/e7e21e4b16864c5ba6b996ab9b49f39c |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Cinética del Soplado a Cobre en un Convertidor Peirce-Smith
par: Carrillo,F., et autres
Publié: (2004) -
Copper + Tin + People: Public Co-Smelting Experimentation in Northwestern Iberia
par: Aaron Lackinger
Publié: (2013) -
A MAJOR PREHISPANIC COPPER PRODUCTION CENTER IDENTIFIED AT COLLAHUASI, SOUTHERN TARAPACÁ ALTIPLANO (CHILE)
par: Figueroa,Valentina, et autres
Publié: (2018) -
ELECTROPOLYMERIZATION OF ANILINE AND PYRROLE IN THE PRESENCE OF COPPER(II)
par: BASÁEZ,L., et autres
Publié: (2001) -
Continuous copper leaching technology
par: L. I. Mukhortova, et autres
Publié: (2021)