Optimal Scheduling of the Peirce-Smith Converter in the Copper Smelting Process

Copper losses during the Peirce-Smith converter (PSC) operation is of great concern in the copper smelting process. Two primary objectives of the PSC are to produce blister copper with a shorter batch time and to keep the copper losses at a minimum level. Due to the nature of the process, those two...

Description complète

Enregistré dans:
Détails bibliographiques
Auteurs principaux: Hussain Ahmed, Luis Ricardez-Sandoval, Matti Vilkko
Format: article
Langue:EN
Publié: MDPI AG 2021
Sujets:
Accès en ligne:https://doaj.org/article/e7e21e4b16864c5ba6b996ab9b49f39c
Tags: Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!