Small-Signal Modeling of Phase-Shifted Full-Bridge Converter Considering the Delay Associated to the Leakage Inductance

This paper demonstrates that in the Phase-Shifted Full-Bridge (PSFB) buck-derived converter, there is a random delay associated with the blanking time produced by the leakage inductance. This random delay predicts the additional phase drop that is present in the frequency response of the open-loop a...

Full description

Saved in:
Bibliographic Details
Main Authors: Diego Ochoa, Antonio Lázaro, Pablo Zumel, Marina Sanz, Jorge Rodriguez de Frutos, Andrés Barrado
Format: article
Language:EN
Published: MDPI AG 2021
Subjects:
T
Online Access:https://doaj.org/article/e9b03f9f2a6b4b2c85a020dfd8384430
Tags: Add Tag
No Tags, Be the first to tag this record!