Profitability improvement of a reservoir power station based on virtual reservoir bidding

Compared with a run-of-river power station, a reservoir power station (RPS), with the capacity of a seasonal regulation function and more, has the unique and irreplaceable attributes of its role in the power grid and society at large. However, under the current power system and market environment in...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Yanmei Zhu, Weibin Huang, Shijun Chen, Guangwen Ma, Yue Liu
Formato: article
Lenguaje:EN
Publicado: IWA Publishing 2021
Materias:
Acceso en línea:https://doaj.org/article/ea699565cba2413f8d62f26d9e3e0bf7
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Descripción
Sumario:Compared with a run-of-river power station, a reservoir power station (RPS), with the capacity of a seasonal regulation function and more, has the unique and irreplaceable attributes of its role in the power grid and society at large. However, under the current power system and market environment in China, these attributes cannot be effectively utilised, resulting in heavy losses to enterprises. It is inevitable for RPSs to participate in the market; therefore, how to improve the profitability of RPS enterprises has become an urgent problem requiring a solution. Based on the control effect on run-off of RPS in a river basin, a new cascade hydropower bidding method and the associated bidding process are proposed. The market entities of the new bidding method are composed of cascade hydropower joints with the RPS as the boundary. The bidding unit benefit-sharing mechanism is constructed, and the accounting method for the benefit-sharing price of the RPS is established, which finally achieves the goal of improving the profitability of the RPS enterprise. Highlights The concept of a virtual reservoir is proposed for the first time, and the bidding process is designed.; Combined with the benefit of the storage capacity of the RPS, a reservoir capacity method that takes into account the actual reservoir water level and the grid absorption rate is established to verify the contribution of the RPS to the bidding benefit.;