Profitability improvement of a reservoir power station based on virtual reservoir bidding

Compared with a run-of-river power station, a reservoir power station (RPS), with the capacity of a seasonal regulation function and more, has the unique and irreplaceable attributes of its role in the power grid and society at large. However, under the current power system and market environment in...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Yanmei Zhu, Weibin Huang, Shijun Chen, Guangwen Ma, Yue Liu
Formato: article
Lenguaje:EN
Publicado: IWA Publishing 2021
Materias:
Acceso en línea:https://doaj.org/article/ea699565cba2413f8d62f26d9e3e0bf7
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:ea699565cba2413f8d62f26d9e3e0bf7
record_format dspace
spelling oai:doaj.org-article:ea699565cba2413f8d62f26d9e3e0bf72021-11-05T20:15:12ZProfitability improvement of a reservoir power station based on virtual reservoir bidding1366-70171996-975910.2166/wp.2021.085https://doaj.org/article/ea699565cba2413f8d62f26d9e3e0bf72021-04-01T00:00:00Zhttp://wp.iwaponline.com/content/23/2/432https://doaj.org/toc/1366-7017https://doaj.org/toc/1996-9759Compared with a run-of-river power station, a reservoir power station (RPS), with the capacity of a seasonal regulation function and more, has the unique and irreplaceable attributes of its role in the power grid and society at large. However, under the current power system and market environment in China, these attributes cannot be effectively utilised, resulting in heavy losses to enterprises. It is inevitable for RPSs to participate in the market; therefore, how to improve the profitability of RPS enterprises has become an urgent problem requiring a solution. Based on the control effect on run-off of RPS in a river basin, a new cascade hydropower bidding method and the associated bidding process are proposed. The market entities of the new bidding method are composed of cascade hydropower joints with the RPS as the boundary. The bidding unit benefit-sharing mechanism is constructed, and the accounting method for the benefit-sharing price of the RPS is established, which finally achieves the goal of improving the profitability of the RPS enterprise. Highlights The concept of a virtual reservoir is proposed for the first time, and the bidding process is designed.; Combined with the benefit of the storage capacity of the RPS, a reservoir capacity method that takes into account the actual reservoir water level and the grid absorption rate is established to verify the contribution of the RPS to the bidding benefit.;Yanmei ZhuWeibin HuangShijun ChenGuangwen MaYue LiuIWA Publishingarticlebenefit-sharingbiddingpower marketprofitabilityreservoir power stationvirtual reservoirRiver, lake, and water-supply engineering (General)TC401-506ENWater Policy, Vol 23, Iss 2, Pp 432-446 (2021)
institution DOAJ
collection DOAJ
language EN
topic benefit-sharing
bidding
power market
profitability
reservoir power station
virtual reservoir
River, lake, and water-supply engineering (General)
TC401-506
spellingShingle benefit-sharing
bidding
power market
profitability
reservoir power station
virtual reservoir
River, lake, and water-supply engineering (General)
TC401-506
Yanmei Zhu
Weibin Huang
Shijun Chen
Guangwen Ma
Yue Liu
Profitability improvement of a reservoir power station based on virtual reservoir bidding
description Compared with a run-of-river power station, a reservoir power station (RPS), with the capacity of a seasonal regulation function and more, has the unique and irreplaceable attributes of its role in the power grid and society at large. However, under the current power system and market environment in China, these attributes cannot be effectively utilised, resulting in heavy losses to enterprises. It is inevitable for RPSs to participate in the market; therefore, how to improve the profitability of RPS enterprises has become an urgent problem requiring a solution. Based on the control effect on run-off of RPS in a river basin, a new cascade hydropower bidding method and the associated bidding process are proposed. The market entities of the new bidding method are composed of cascade hydropower joints with the RPS as the boundary. The bidding unit benefit-sharing mechanism is constructed, and the accounting method for the benefit-sharing price of the RPS is established, which finally achieves the goal of improving the profitability of the RPS enterprise. Highlights The concept of a virtual reservoir is proposed for the first time, and the bidding process is designed.; Combined with the benefit of the storage capacity of the RPS, a reservoir capacity method that takes into account the actual reservoir water level and the grid absorption rate is established to verify the contribution of the RPS to the bidding benefit.;
format article
author Yanmei Zhu
Weibin Huang
Shijun Chen
Guangwen Ma
Yue Liu
author_facet Yanmei Zhu
Weibin Huang
Shijun Chen
Guangwen Ma
Yue Liu
author_sort Yanmei Zhu
title Profitability improvement of a reservoir power station based on virtual reservoir bidding
title_short Profitability improvement of a reservoir power station based on virtual reservoir bidding
title_full Profitability improvement of a reservoir power station based on virtual reservoir bidding
title_fullStr Profitability improvement of a reservoir power station based on virtual reservoir bidding
title_full_unstemmed Profitability improvement of a reservoir power station based on virtual reservoir bidding
title_sort profitability improvement of a reservoir power station based on virtual reservoir bidding
publisher IWA Publishing
publishDate 2021
url https://doaj.org/article/ea699565cba2413f8d62f26d9e3e0bf7
work_keys_str_mv AT yanmeizhu profitabilityimprovementofareservoirpowerstationbasedonvirtualreservoirbidding
AT weibinhuang profitabilityimprovementofareservoirpowerstationbasedonvirtualreservoirbidding
AT shijunchen profitabilityimprovementofareservoirpowerstationbasedonvirtualreservoirbidding
AT guangwenma profitabilityimprovementofareservoirpowerstationbasedonvirtualreservoirbidding
AT yueliu profitabilityimprovementofareservoirpowerstationbasedonvirtualreservoirbidding
_version_ 1718444074646634496