Profitability improvement of a reservoir power station based on virtual reservoir bidding
Compared with a run-of-river power station, a reservoir power station (RPS), with the capacity of a seasonal regulation function and more, has the unique and irreplaceable attributes of its role in the power grid and society at large. However, under the current power system and market environment in...
Guardado en:
Autores principales: | Yanmei Zhu, Weibin Huang, Shijun Chen, Guangwen Ma, Yue Liu |
---|---|
Formato: | article |
Lenguaje: | EN |
Publicado: |
IWA Publishing
2021
|
Materias: | |
Acceso en línea: | https://doaj.org/article/ea699565cba2413f8d62f26d9e3e0bf7 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Ejemplares similares
-
Optimal water allocation method for joint operation of a reservoir and pumping station under insufficient irrigation
por: Cong Wei, et al.
Publicado: (2021) -
Multi-objective optimal operation of reservoir group in Jialing River based on DREAM algorithm
por: Wei Diao, et al.
Publicado: (2021) -
Risk and benefit analysis of multifunctional reservoir staged operating
por: Chongxun Mo, et al.
Publicado: (2021) -
Quantitative assessment of water level regime alterations during 1959–2016 caused by Three Gorges Reservoir in the Dongting Lake, China
por: Hongxiang Wang, et al.
Publicado: (2021) -
Water quality index and spatio-temporal perspective of a large Brazilian water reservoir
por: Karla Lorrane de Oliveira, et al.
Publicado: (2021)