Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
Planning and managing the risks is the first step that should be performed at the start of projects and before doing the works. Construction projects start in a complex and dynamic environment and due to the close relation between the parameters of projects and unknown environment, they face with th...
Guardado en:
Autores principales: | , |
---|---|
Formato: | article |
Lenguaje: | FA |
Publicado: |
Iranian Society of Structrual Engineering (ISSE)
2019
|
Materias: | |
Acceso en línea: | https://doaj.org/article/ecbe2b9623e945eea12b7790b398b91e |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:doaj.org-article:ecbe2b9623e945eea12b7790b398b91e |
---|---|
record_format |
dspace |
spelling |
oai:doaj.org-article:ecbe2b9623e945eea12b7790b398b91e2021-11-08T15:51:06ZEvaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model2476-39772538-261610.22065/jsce.2017.89816.1238https://doaj.org/article/ecbe2b9623e945eea12b7790b398b91e2019-02-01T00:00:00Zhttps://www.jsce.ir/article_51823_d930044f9f6b44c5f5ac70c792310767.pdfhttps://doaj.org/toc/2476-3977https://doaj.org/toc/2538-2616Planning and managing the risks is the first step that should be performed at the start of projects and before doing the works. Construction projects start in a complex and dynamic environment and due to the close relation between the parameters of projects and unknown environment, they face with the uncertainties and risks. In this paper, construction projects are evaluated by combining multi criteria decision making methods, i.e., fuzzy AHP and fuzzy VIKOR. The fuzzy concepts are utilized for modelling the existing uncertainty in data. For doing so, first a comprehensive list of risk factors affecting on the success of construction projects is taken from the literature review. They are customized by the experts’ opinions and then the final risk factors are selected. The fuzzy AHP is used to determine the importance of the risk factors. The results of applying fuzzy AHP show that the risks of time and cost have high weights among risk factors. Furthermore, weakness in the construction schedule, the collapse, and the high bidding price are determined as the high importance sub factors of risk. Finally, the proposed model is applied for assessing and prioritizing five construction projects in the area of road construction in Isfahan, Iran.Seyed Morteza HatefiAli HeidariIranian Society of Structrual Engineering (ISSE)articleconstruction projectsrisk managementrisk factorsfuzzy ahpfuzzy vikorBridge engineeringTG1-470Building constructionTH1-9745FAJournal of Structural and Construction Engineering, Vol 5, Iss شماره ویژه 4, Pp 156-175 (2019) |
institution |
DOAJ |
collection |
DOAJ |
language |
FA |
topic |
construction projects risk management risk factors fuzzy ahp fuzzy vikor Bridge engineering TG1-470 Building construction TH1-9745 |
spellingShingle |
construction projects risk management risk factors fuzzy ahp fuzzy vikor Bridge engineering TG1-470 Building construction TH1-9745 Seyed Morteza Hatefi Ali Heidari Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model |
description |
Planning and managing the risks is the first step that should be performed at the start of projects and before doing the works. Construction projects start in a complex and dynamic environment and due to the close relation between the parameters of projects and unknown environment, they face with the uncertainties and risks. In this paper, construction projects are evaluated by combining multi criteria decision making methods, i.e., fuzzy AHP and fuzzy VIKOR. The fuzzy concepts are utilized for modelling the existing uncertainty in data. For doing so, first a comprehensive list of risk factors affecting on the success of construction projects is taken from the literature review. They are customized by the experts’ opinions and then the final risk factors are selected. The fuzzy AHP is used to determine the importance of the risk factors. The results of applying fuzzy AHP show that the risks of time and cost have high weights among risk factors. Furthermore, weakness in the construction schedule, the collapse, and the high bidding price are determined as the high importance sub factors of risk. Finally, the proposed model is applied for assessing and prioritizing five construction projects in the area of road construction in Isfahan, Iran. |
format |
article |
author |
Seyed Morteza Hatefi Ali Heidari |
author_facet |
Seyed Morteza Hatefi Ali Heidari |
author_sort |
Seyed Morteza Hatefi |
title |
Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model |
title_short |
Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model |
title_full |
Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model |
title_fullStr |
Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model |
title_full_unstemmed |
Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model |
title_sort |
evaluating construction projects based on the risk factors by using an integrated fuzzy ahp and fuzzy vikor model |
publisher |
Iranian Society of Structrual Engineering (ISSE) |
publishDate |
2019 |
url |
https://doaj.org/article/ecbe2b9623e945eea12b7790b398b91e |
work_keys_str_mv |
AT seyedmortezahatefi evaluatingconstructionprojectsbasedontheriskfactorsbyusinganintegratedfuzzyahpandfuzzyvikormodel AT aliheidari evaluatingconstructionprojectsbasedontheriskfactorsbyusinganintegratedfuzzyahpandfuzzyvikormodel |
_version_ |
1718441711832662016 |