Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model

Planning and managing the risks is the first step that should be performed at the start of projects and before doing the works. Construction projects start in a complex and dynamic environment and due to the close relation between the parameters of projects and unknown environment, they face with th...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Seyed Morteza Hatefi, Ali Heidari
Formato: article
Lenguaje:FA
Publicado: Iranian Society of Structrual Engineering (ISSE) 2019
Materias:
Acceso en línea:https://doaj.org/article/ecbe2b9623e945eea12b7790b398b91e
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:ecbe2b9623e945eea12b7790b398b91e
record_format dspace
spelling oai:doaj.org-article:ecbe2b9623e945eea12b7790b398b91e2021-11-08T15:51:06ZEvaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model2476-39772538-261610.22065/jsce.2017.89816.1238https://doaj.org/article/ecbe2b9623e945eea12b7790b398b91e2019-02-01T00:00:00Zhttps://www.jsce.ir/article_51823_d930044f9f6b44c5f5ac70c792310767.pdfhttps://doaj.org/toc/2476-3977https://doaj.org/toc/2538-2616Planning and managing the risks is the first step that should be performed at the start of projects and before doing the works. Construction projects start in a complex and dynamic environment and due to the close relation between the parameters of projects and unknown environment, they face with the uncertainties and risks. In this paper, construction projects are evaluated by combining multi criteria decision making methods, i.e., fuzzy AHP and fuzzy VIKOR. The fuzzy concepts are utilized for modelling the existing uncertainty in data. For doing so, first a comprehensive list of risk factors affecting on the success of construction projects is taken from the literature review. They are customized by the experts’ opinions and then the final risk factors are selected. The fuzzy AHP is used to determine the importance of the risk factors. The results of applying fuzzy AHP show that the risks of time and cost have high weights among risk factors. Furthermore, weakness in the construction schedule, the collapse, and the high bidding price are determined as the high importance sub factors of risk. Finally, the proposed model is applied for assessing and prioritizing five construction projects in the area of road construction in Isfahan, Iran.Seyed Morteza HatefiAli HeidariIranian Society of Structrual Engineering (ISSE)articleconstruction projectsrisk managementrisk factorsfuzzy ahpfuzzy vikorBridge engineeringTG1-470Building constructionTH1-9745FAJournal of Structural and Construction Engineering, Vol 5, Iss شماره ویژه 4, Pp 156-175 (2019)
institution DOAJ
collection DOAJ
language FA
topic construction projects
risk management
risk factors
fuzzy ahp
fuzzy vikor
Bridge engineering
TG1-470
Building construction
TH1-9745
spellingShingle construction projects
risk management
risk factors
fuzzy ahp
fuzzy vikor
Bridge engineering
TG1-470
Building construction
TH1-9745
Seyed Morteza Hatefi
Ali Heidari
Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
description Planning and managing the risks is the first step that should be performed at the start of projects and before doing the works. Construction projects start in a complex and dynamic environment and due to the close relation between the parameters of projects and unknown environment, they face with the uncertainties and risks. In this paper, construction projects are evaluated by combining multi criteria decision making methods, i.e., fuzzy AHP and fuzzy VIKOR. The fuzzy concepts are utilized for modelling the existing uncertainty in data. For doing so, first a comprehensive list of risk factors affecting on the success of construction projects is taken from the literature review. They are customized by the experts’ opinions and then the final risk factors are selected. The fuzzy AHP is used to determine the importance of the risk factors. The results of applying fuzzy AHP show that the risks of time and cost have high weights among risk factors. Furthermore, weakness in the construction schedule, the collapse, and the high bidding price are determined as the high importance sub factors of risk. Finally, the proposed model is applied for assessing and prioritizing five construction projects in the area of road construction in Isfahan, Iran.
format article
author Seyed Morteza Hatefi
Ali Heidari
author_facet Seyed Morteza Hatefi
Ali Heidari
author_sort Seyed Morteza Hatefi
title Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
title_short Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
title_full Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
title_fullStr Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
title_full_unstemmed Evaluating construction projects based on the risk factors by using an integrated fuzzy AHP and fuzzy VIKOR model
title_sort evaluating construction projects based on the risk factors by using an integrated fuzzy ahp and fuzzy vikor model
publisher Iranian Society of Structrual Engineering (ISSE)
publishDate 2019
url https://doaj.org/article/ecbe2b9623e945eea12b7790b398b91e
work_keys_str_mv AT seyedmortezahatefi evaluatingconstructionprojectsbasedontheriskfactorsbyusinganintegratedfuzzyahpandfuzzyvikormodel
AT aliheidari evaluatingconstructionprojectsbasedontheriskfactorsbyusinganintegratedfuzzyahpandfuzzyvikormodel
_version_ 1718441711832662016