Proposal for the flow of material and adjustments to the storage system of an external service provider

This article deals with issues related to the flow of material to the assembly line and examines the possibilities of reducing the costs of this process. It is based on the current state of the transport of individual parts to the producing company and the storage system using Kanban and Just in Seq...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Strohmandl Jan, Kalupová Blanka, Rejzková Kateřina, Tomek Miroslav
Formato: article
Lenguaje:EN
Publicado: De Gruyter 2021
Materias:
Acceso en línea:https://doaj.org/article/efe711619f1e40fa953d2b89dbf55340
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:efe711619f1e40fa953d2b89dbf55340
record_format dspace
spelling oai:doaj.org-article:efe711619f1e40fa953d2b89dbf553402021-12-05T14:10:47ZProposal for the flow of material and adjustments to the storage system of an external service provider2391-543910.1515/eng-2021-0098https://doaj.org/article/efe711619f1e40fa953d2b89dbf553402021-10-01T00:00:00Zhttps://doi.org/10.1515/eng-2021-0098https://doaj.org/toc/2391-5439This article deals with issues related to the flow of material to the assembly line and examines the possibilities of reducing the costs of this process. It is based on the current state of the transport of individual parts to the producing company and the storage system using Kanban and Just in Sequence (JIS) logistics technologies, and the subsequent collection of material for transport to the assembly line. The change in the system of transport technology has led to a reduction of the total storage space and costs, and at the same time, the processes related to storage and collection of parts have been simplified. The whole process of material flow to the assembly line is solved using the real supply system via the JIS technology, together with the system of receipt and storage of components in connection with individual operations during the handling and storage of these components, and their picking and transport to the assembly line. Evidently, the change in the system and the associated savings can also be employed to warehouses and manufacturing companies of the automotive industry, which use automated assembly lines with the timing of the assembly process of the final product.Strohmandl JanKalupová BlankaRejzková KateřinaTomek MiroslavDe GruyterarticletechnologystoragetransportassemblyproductionEngineering (General). Civil engineering (General)TA1-2040ENOpen Engineering, Vol 11, Iss 1, Pp 948-955 (2021)
institution DOAJ
collection DOAJ
language EN
topic technology
storage
transport
assembly
production
Engineering (General). Civil engineering (General)
TA1-2040
spellingShingle technology
storage
transport
assembly
production
Engineering (General). Civil engineering (General)
TA1-2040
Strohmandl Jan
Kalupová Blanka
Rejzková Kateřina
Tomek Miroslav
Proposal for the flow of material and adjustments to the storage system of an external service provider
description This article deals with issues related to the flow of material to the assembly line and examines the possibilities of reducing the costs of this process. It is based on the current state of the transport of individual parts to the producing company and the storage system using Kanban and Just in Sequence (JIS) logistics technologies, and the subsequent collection of material for transport to the assembly line. The change in the system of transport technology has led to a reduction of the total storage space and costs, and at the same time, the processes related to storage and collection of parts have been simplified. The whole process of material flow to the assembly line is solved using the real supply system via the JIS technology, together with the system of receipt and storage of components in connection with individual operations during the handling and storage of these components, and their picking and transport to the assembly line. Evidently, the change in the system and the associated savings can also be employed to warehouses and manufacturing companies of the automotive industry, which use automated assembly lines with the timing of the assembly process of the final product.
format article
author Strohmandl Jan
Kalupová Blanka
Rejzková Kateřina
Tomek Miroslav
author_facet Strohmandl Jan
Kalupová Blanka
Rejzková Kateřina
Tomek Miroslav
author_sort Strohmandl Jan
title Proposal for the flow of material and adjustments to the storage system of an external service provider
title_short Proposal for the flow of material and adjustments to the storage system of an external service provider
title_full Proposal for the flow of material and adjustments to the storage system of an external service provider
title_fullStr Proposal for the flow of material and adjustments to the storage system of an external service provider
title_full_unstemmed Proposal for the flow of material and adjustments to the storage system of an external service provider
title_sort proposal for the flow of material and adjustments to the storage system of an external service provider
publisher De Gruyter
publishDate 2021
url https://doaj.org/article/efe711619f1e40fa953d2b89dbf55340
work_keys_str_mv AT strohmandljan proposalfortheflowofmaterialandadjustmentstothestoragesystemofanexternalserviceprovider
AT kalupovablanka proposalfortheflowofmaterialandadjustmentstothestoragesystemofanexternalserviceprovider
AT rejzkovakaterina proposalfortheflowofmaterialandadjustmentstothestoragesystemofanexternalserviceprovider
AT tomekmiroslav proposalfortheflowofmaterialandadjustmentstothestoragesystemofanexternalserviceprovider
_version_ 1718371753179217920