Simultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant

As an essential part of Heat Integration, the heat exchanger network (HEN) plays a vital role in large-scale industrial fields. The optimisation of HEN can increase energy efficiency and considerably save the operating and investment cost of the project. This study presents a novel approach for simu...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Yang Zhang, Bohong Wang, Yongtu Liang, Meng Yuan, Jirí Jaromír Klemeš
Formato: article
Lenguaje:EN
Publicado: AIDIC Servizi S.r.l. 2021
Materias:
Acceso en línea:https://doaj.org/article/f91447e413c5466792922860c417c960
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:f91447e413c5466792922860c417c960
record_format dspace
spelling oai:doaj.org-article:f91447e413c5466792922860c417c9602021-11-15T21:48:55ZSimultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant10.3303/CET21880262283-9216https://doaj.org/article/f91447e413c5466792922860c417c9602021-11-01T00:00:00Zhttps://www.cetjournal.it/index.php/cet/article/view/11819https://doaj.org/toc/2283-9216As an essential part of Heat Integration, the heat exchanger network (HEN) plays a vital role in large-scale industrial fields. The optimisation of HEN can increase energy efficiency and considerably save the operating and investment cost of the project. This study presents a novel approach for simultaneous optimisation of plant operating variables and the HEN structure of an existing natural gas purification process. The objective function is the total energy consumption of the studied process. A two-stage method is developed for optimisation. In the first stage, a particle swarm optimisation (PSO) algorithm is developed to optimise variables including tower top pressure, tower bottom pressure, and reflux ratio on the HEN, thereby changing the initial temperatures of cold and hot streams in the HEN. In the second stage, a shifted retrofit thermodynamic grid diagram (SRTGD)-based model and the corresponding solving algorithm was applied to retrofit the HEN. The case study shows that the optimal operating conditions of towers and temperature spans of heat exchangers can be solved by the proposed method to reduce the total energy consumption. The case study shows that the total energy consumption is reduced by 41.5 %.Yang ZhangBohong WangYongtu LiangMeng YuanJirí Jaromír KlemešAIDIC Servizi S.r.l.articleChemical engineeringTP155-156Computer engineering. Computer hardwareTK7885-7895ENChemical Engineering Transactions, Vol 88 (2021)
institution DOAJ
collection DOAJ
language EN
topic Chemical engineering
TP155-156
Computer engineering. Computer hardware
TK7885-7895
spellingShingle Chemical engineering
TP155-156
Computer engineering. Computer hardware
TK7885-7895
Yang Zhang
Bohong Wang
Yongtu Liang
Meng Yuan
Jirí Jaromír Klemeš
Simultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant
description As an essential part of Heat Integration, the heat exchanger network (HEN) plays a vital role in large-scale industrial fields. The optimisation of HEN can increase energy efficiency and considerably save the operating and investment cost of the project. This study presents a novel approach for simultaneous optimisation of plant operating variables and the HEN structure of an existing natural gas purification process. The objective function is the total energy consumption of the studied process. A two-stage method is developed for optimisation. In the first stage, a particle swarm optimisation (PSO) algorithm is developed to optimise variables including tower top pressure, tower bottom pressure, and reflux ratio on the HEN, thereby changing the initial temperatures of cold and hot streams in the HEN. In the second stage, a shifted retrofit thermodynamic grid diagram (SRTGD)-based model and the corresponding solving algorithm was applied to retrofit the HEN. The case study shows that the optimal operating conditions of towers and temperature spans of heat exchangers can be solved by the proposed method to reduce the total energy consumption. The case study shows that the total energy consumption is reduced by 41.5 %.
format article
author Yang Zhang
Bohong Wang
Yongtu Liang
Meng Yuan
Jirí Jaromír Klemeš
author_facet Yang Zhang
Bohong Wang
Yongtu Liang
Meng Yuan
Jirí Jaromír Klemeš
author_sort Yang Zhang
title Simultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant
title_short Simultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant
title_full Simultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant
title_fullStr Simultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant
title_full_unstemmed Simultaneously Retrofit of Heat Exchanger Networks and Towers for a Natural Gas Purification Plant
title_sort simultaneously retrofit of heat exchanger networks and towers for a natural gas purification plant
publisher AIDIC Servizi S.r.l.
publishDate 2021
url https://doaj.org/article/f91447e413c5466792922860c417c960
work_keys_str_mv AT yangzhang simultaneouslyretrofitofheatexchangernetworksandtowersforanaturalgaspurificationplant
AT bohongwang simultaneouslyretrofitofheatexchangernetworksandtowersforanaturalgaspurificationplant
AT yongtuliang simultaneouslyretrofitofheatexchangernetworksandtowersforanaturalgaspurificationplant
AT mengyuan simultaneouslyretrofitofheatexchangernetworksandtowersforanaturalgaspurificationplant
AT jirijaromirklemes simultaneouslyretrofitofheatexchangernetworksandtowersforanaturalgaspurificationplant
_version_ 1718426822328188928