A comparison of optimization models for lumber production planning
The performance of sawmills is strongly dependent on how logs are sawn into lumber in order to satisfy the customer demands. To do this, sawmill managers have to decide which cutting patterns have to be applied to logs of different dimensions. Optimization models have been proposed to assist decisio...
Guardado en:
Autores principales: | , , |
---|---|
Lenguaje: | English |
Publicado: |
Universidad Austral de Chile, Facultad de Ciencias Forestales
2015
|
Materias: | |
Acceso en línea: | http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0717-92002015000200009 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:scielo:S0717-92002015000200009 |
---|---|
record_format |
dspace |
spelling |
oai:scielo:S0717-920020150002000092015-09-14A comparison of optimization models for lumber production planningVergara,Francisco PPalma,Cristian DSepúlveda,Héctor linear programming cutting patterns sawmill production The performance of sawmills is strongly dependent on how logs are sawn into lumber in order to satisfy the customer demands. To do this, sawmill managers have to decide which cutting patterns have to be applied to logs of different dimensions. Optimization models have been proposed to assist decision makers in this process, but only the profit maximization and the cost minimization of the decisions have been considered as the models objective. In this paper, a linear optimization model was formulated to address lumber production planning and applied to a real problem. The current decisions at sawmills were compared with five different objective functions: the two previously mentioned plus waste minimization, log number minimization and production time minimization. Only profit maximization and waste minimization models reported positive economic returns. Although the current decision at sawmills also reported a positive economic return, the same economic result was obtained with significantly fewer resources using the waste minimization model. The effects of the different objectives on the production indicators were discussed.info:eu-repo/semantics/openAccessUniversidad Austral de Chile, Facultad de Ciencias ForestalesBosque (Valdivia) v.36 n.2 20152015-01-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0717-92002015000200009en10.4067/S0717-92002015000200009 |
institution |
Scielo Chile |
collection |
Scielo Chile |
language |
English |
topic |
linear programming cutting patterns sawmill production |
spellingShingle |
linear programming cutting patterns sawmill production Vergara,Francisco P Palma,Cristian D Sepúlveda,Héctor A comparison of optimization models for lumber production planning |
description |
The performance of sawmills is strongly dependent on how logs are sawn into lumber in order to satisfy the customer demands. To do this, sawmill managers have to decide which cutting patterns have to be applied to logs of different dimensions. Optimization models have been proposed to assist decision makers in this process, but only the profit maximization and the cost minimization of the decisions have been considered as the models objective. In this paper, a linear optimization model was formulated to address lumber production planning and applied to a real problem. The current decisions at sawmills were compared with five different objective functions: the two previously mentioned plus waste minimization, log number minimization and production time minimization. Only profit maximization and waste minimization models reported positive economic returns. Although the current decision at sawmills also reported a positive economic return, the same economic result was obtained with significantly fewer resources using the waste minimization model. The effects of the different objectives on the production indicators were discussed. |
author |
Vergara,Francisco P Palma,Cristian D Sepúlveda,Héctor |
author_facet |
Vergara,Francisco P Palma,Cristian D Sepúlveda,Héctor |
author_sort |
Vergara,Francisco P |
title |
A comparison of optimization models for lumber production planning |
title_short |
A comparison of optimization models for lumber production planning |
title_full |
A comparison of optimization models for lumber production planning |
title_fullStr |
A comparison of optimization models for lumber production planning |
title_full_unstemmed |
A comparison of optimization models for lumber production planning |
title_sort |
comparison of optimization models for lumber production planning |
publisher |
Universidad Austral de Chile, Facultad de Ciencias Forestales |
publishDate |
2015 |
url |
http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0717-92002015000200009 |
work_keys_str_mv |
AT vergarafranciscop acomparisonofoptimizationmodelsforlumberproductionplanning AT palmacristiand acomparisonofoptimizationmodelsforlumberproductionplanning AT sepulvedahector acomparisonofoptimizationmodelsforlumberproductionplanning AT vergarafranciscop comparisonofoptimizationmodelsforlumberproductionplanning AT palmacristiand comparisonofoptimizationmodelsforlumberproductionplanning AT sepulvedahector comparisonofoptimizationmodelsforlumberproductionplanning |
_version_ |
1718444209875189760 |