Using Flow Simulation as a Decision Tool for Improvements in Sawmill Productivity

We developed a sawmill flow simulation model to identify production bottlenecks and determine where productivity improvements could be made. Sawmills often invest in a new machine center and then find out that the processing bottleneck just moves somewhere else. Our approach was specifically designe...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Thoews,Steven E, Maness,Thomas C, Ristea,Catalin
Lenguaje:English
Publicado: Universidad del Bío-Bío 2008
Materias:
Acceso en línea:http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-221X2008000300006
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:scielo:S0718-221X2008000300006
record_format dspace
spelling oai:scielo:S0718-221X20080003000062009-08-19Using Flow Simulation as a Decision Tool for Improvements in Sawmill ProductivityThoews,Steven EManess,Thomas CRistea,Catalin Flow simulation sawmill manufacturing production bottleneck productivity We developed a sawmill flow simulation model to identify production bottlenecks and determine where productivity improvements could be made. Sawmills often invest in a new machine center and then find out that the processing bottleneck just moves somewhere else. Our approach was specifically designed to investigate the effects of such changes on the entire system. We determined that the trimmer was the system bottleneck when both the small log and large log lines were running concomitantly. Under base case conditions, the model predicted an average board output of 13,147 boards. An increase in the processing capability of the trimmer resulted in a shift of the bottleneck from the small log line to the large log line (at the edger). This bottleneck shift was further investigated and, by allowing the simulation model to manipulate machine settings for the trimmer and edger, it was able to maximize the modeled average board output to 17,996 boards per shift (when edger set up times were not considered) and 16,708 boards per shift (with edger setup times included). These findings were presented to the sawmill management and subsequently implemented as specific improvements at the trimmer machine center, which in turn resulted in an actual increase of 10% in their sawmill’s lumber volume output.info:eu-repo/semantics/openAccessUniversidad del Bío-BíoMaderas. Ciencia y tecnología v.10 n.3 20082008-01-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-221X2008000300006en10.4067/S0718-221X2008000300006
institution Scielo Chile
collection Scielo Chile
language English
topic Flow simulation
sawmill manufacturing
production bottleneck
productivity
spellingShingle Flow simulation
sawmill manufacturing
production bottleneck
productivity
Thoews,Steven E
Maness,Thomas C
Ristea,Catalin
Using Flow Simulation as a Decision Tool for Improvements in Sawmill Productivity
description We developed a sawmill flow simulation model to identify production bottlenecks and determine where productivity improvements could be made. Sawmills often invest in a new machine center and then find out that the processing bottleneck just moves somewhere else. Our approach was specifically designed to investigate the effects of such changes on the entire system. We determined that the trimmer was the system bottleneck when both the small log and large log lines were running concomitantly. Under base case conditions, the model predicted an average board output of 13,147 boards. An increase in the processing capability of the trimmer resulted in a shift of the bottleneck from the small log line to the large log line (at the edger). This bottleneck shift was further investigated and, by allowing the simulation model to manipulate machine settings for the trimmer and edger, it was able to maximize the modeled average board output to 17,996 boards per shift (when edger set up times were not considered) and 16,708 boards per shift (with edger setup times included). These findings were presented to the sawmill management and subsequently implemented as specific improvements at the trimmer machine center, which in turn resulted in an actual increase of 10% in their sawmill’s lumber volume output.
author Thoews,Steven E
Maness,Thomas C
Ristea,Catalin
author_facet Thoews,Steven E
Maness,Thomas C
Ristea,Catalin
author_sort Thoews,Steven E
title Using Flow Simulation as a Decision Tool for Improvements in Sawmill Productivity
title_short Using Flow Simulation as a Decision Tool for Improvements in Sawmill Productivity
title_full Using Flow Simulation as a Decision Tool for Improvements in Sawmill Productivity
title_fullStr Using Flow Simulation as a Decision Tool for Improvements in Sawmill Productivity
title_full_unstemmed Using Flow Simulation as a Decision Tool for Improvements in Sawmill Productivity
title_sort using flow simulation as a decision tool for improvements in sawmill productivity
publisher Universidad del Bío-Bío
publishDate 2008
url http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-221X2008000300006
work_keys_str_mv AT thoewsstevene usingflowsimulationasadecisiontoolforimprovementsinsawmillproductivity
AT manessthomasc usingflowsimulationasadecisiontoolforimprovementsinsawmillproductivity
AT risteacatalin usingflowsimulationasadecisiontoolforimprovementsinsawmillproductivity
_version_ 1714202542635745280