Dynamic analysis of an immersed tunnel in Izmir

Abstract The original design of the planned Izmir Bay Immersed Tube Tunnel, considered it to be a continuous subsea tunnel for the whole length of about 7.6 km. But this was later changed into having 2 shorter tubes of 2.7 km long each connected thru’ a 2.2 km long artificial island create...

Full description

Saved in:
Bibliographic Details
Main Authors: Egeli,Isfendiyar, Gurbuz,Cagdas
Language:English
Published: Escuela de Construcción Civil, Pontificia Universidad Católica de Chile 2018
Subjects:
Online Access:http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2018000100103
Tags: Add Tag
No Tags, Be the first to tag this record!