Methodology for determining the most severe risks of a construction project and identification of risky projects

Abstract: Construction projects involve very different kinds of risks of distinct natures and demand an agile and flexible risk assessment methodology. This study has analyzed scholarly literature and best practices to find current weaknesses. Two main solutions are presented in this paper in respon...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Vegas-Fernández,Fernando, Rodríguez-López,Fernando
Lenguaje:English
Publicado: Escuela de Construcción Civil, Pontificia Universidad Católica de Chile 2018
Materias:
Acceso en línea:http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2018000300423
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:scielo:S0718-915X2018000300423
record_format dspace
spelling oai:scielo:S0718-915X20180003004232019-03-28Methodology for determining the most severe risks of a construction project and identification of risky projectsVegas-Fernández,FernandoRodríguez-López,Fernando Risk indicator overall risk weighting case study risk report. Abstract: Construction projects involve very different kinds of risks of distinct natures and demand an agile and flexible risk assessment methodology. This study has analyzed scholarly literature and best practices to find current weaknesses. Two main solutions are presented in this paper in response to the findings of the analysis: a general purpose, quantitative key risk indicator, the “Risk Visibility Factor” (Fv), that yields a single linear 0-100 value for each risk event out of its impact and likelihood; and a summarizing method based on Fv to obtain the overall risk for two or more risk events, expressed as a single equivalent risk event with its own impact and likelihood. The first solution improves current risk assessment by providing a more intuitive and understandable indicator to rate risks and projects; the second one, with recursive capability, allows risk scenarios (e.g., projects) to be seen as single risk event, without any kind of limitation on the number and nature of risks, making it easier to compare the risk severity of distinct projects. Both solutions can be used to define the risk appetite and to compare with it any risk event or scenario.info:eu-repo/semantics/openAccessEscuela de Construcción Civil, Pontificia Universidad Católica de ChileRevista de la construcción v.17 n.3 20182018-12-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2018000300423en10.7764/rdlc.17.3.423
institution Scielo Chile
collection Scielo Chile
language English
topic Risk indicator
overall risk
weighting
case study
risk report.
spellingShingle Risk indicator
overall risk
weighting
case study
risk report.
Vegas-Fernández,Fernando
Rodríguez-López,Fernando
Methodology for determining the most severe risks of a construction project and identification of risky projects
description Abstract: Construction projects involve very different kinds of risks of distinct natures and demand an agile and flexible risk assessment methodology. This study has analyzed scholarly literature and best practices to find current weaknesses. Two main solutions are presented in this paper in response to the findings of the analysis: a general purpose, quantitative key risk indicator, the “Risk Visibility Factor” (Fv), that yields a single linear 0-100 value for each risk event out of its impact and likelihood; and a summarizing method based on Fv to obtain the overall risk for two or more risk events, expressed as a single equivalent risk event with its own impact and likelihood. The first solution improves current risk assessment by providing a more intuitive and understandable indicator to rate risks and projects; the second one, with recursive capability, allows risk scenarios (e.g., projects) to be seen as single risk event, without any kind of limitation on the number and nature of risks, making it easier to compare the risk severity of distinct projects. Both solutions can be used to define the risk appetite and to compare with it any risk event or scenario.
author Vegas-Fernández,Fernando
Rodríguez-López,Fernando
author_facet Vegas-Fernández,Fernando
Rodríguez-López,Fernando
author_sort Vegas-Fernández,Fernando
title Methodology for determining the most severe risks of a construction project and identification of risky projects
title_short Methodology for determining the most severe risks of a construction project and identification of risky projects
title_full Methodology for determining the most severe risks of a construction project and identification of risky projects
title_fullStr Methodology for determining the most severe risks of a construction project and identification of risky projects
title_full_unstemmed Methodology for determining the most severe risks of a construction project and identification of risky projects
title_sort methodology for determining the most severe risks of a construction project and identification of risky projects
publisher Escuela de Construcción Civil, Pontificia Universidad Católica de Chile
publishDate 2018
url http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2018000300423
work_keys_str_mv AT vegasfernandezfernando methodologyfordeterminingthemostsevererisksofaconstructionprojectandidentificationofriskyprojects
AT rodriguezlopezfernando methodologyfordeterminingthemostsevererisksofaconstructionprojectandidentificationofriskyprojects
_version_ 1714206293807333376