Marshall parameters for quality control of hot mix asphalt after pavement construction
Abstract Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a method also used for quality control (QC) at the time of road construction. Due to several factors, sometimes it is not possible to sample the surfac...
Guardado en:
Autores principales: | , , |
---|---|
Lenguaje: | English |
Publicado: |
Escuela de Construcción Civil, Pontificia Universidad Católica de Chile
2019
|
Materias: | |
Acceso en línea: | http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000100178 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:scielo:S0718-915X2019000100178 |
---|---|
record_format |
dspace |
spelling |
oai:scielo:S0718-915X20190001001782019-05-22Marshall parameters for quality control of hot mix asphalt after pavement constructionBojorque Iñeguez,JaimeFlores,CristianVásquez,Mario Hot mix asphalt quality control pavement construction Marshall Test stability and flow Abstract Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a method also used for quality control (QC) at the time of road construction. Due to several factors, sometimes it is not possible to sample the surface layer when constructed. When this occurs, QC is performed after construction by analyzing cores. Current regulations, however, fail having clear procedures regarding the collection and analysis of pavement cores after the complete placement of the asphalt mixture. For this reason, this study proposes a comparative analysis of Marshall parameters, mixture densities, and aggregates gradation obtained from specimens obtained during construction, versus cores samples extracted 30 and 60 days later. The research revealed that all the parameters measured on core samples, except flow, could be used to approve asphalt paving works after its construction.info:eu-repo/semantics/openAccessEscuela de Construcción Civil, Pontificia Universidad Católica de ChileRevista de la construcción v.18 n.1 20192019-04-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000100178en10.7764/rdlc.18.1.178 |
institution |
Scielo Chile |
collection |
Scielo Chile |
language |
English |
topic |
Hot mix asphalt quality control pavement construction Marshall Test stability and flow |
spellingShingle |
Hot mix asphalt quality control pavement construction Marshall Test stability and flow Bojorque Iñeguez,Jaime Flores,Cristian Vásquez,Mario Marshall parameters for quality control of hot mix asphalt after pavement construction |
description |
Abstract Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a method also used for quality control (QC) at the time of road construction. Due to several factors, sometimes it is not possible to sample the surface layer when constructed. When this occurs, QC is performed after construction by analyzing cores. Current regulations, however, fail having clear procedures regarding the collection and analysis of pavement cores after the complete placement of the asphalt mixture. For this reason, this study proposes a comparative analysis of Marshall parameters, mixture densities, and aggregates gradation obtained from specimens obtained during construction, versus cores samples extracted 30 and 60 days later. The research revealed that all the parameters measured on core samples, except flow, could be used to approve asphalt paving works after its construction. |
author |
Bojorque Iñeguez,Jaime Flores,Cristian Vásquez,Mario |
author_facet |
Bojorque Iñeguez,Jaime Flores,Cristian Vásquez,Mario |
author_sort |
Bojorque Iñeguez,Jaime |
title |
Marshall parameters for quality control of hot mix asphalt after pavement construction |
title_short |
Marshall parameters for quality control of hot mix asphalt after pavement construction |
title_full |
Marshall parameters for quality control of hot mix asphalt after pavement construction |
title_fullStr |
Marshall parameters for quality control of hot mix asphalt after pavement construction |
title_full_unstemmed |
Marshall parameters for quality control of hot mix asphalt after pavement construction |
title_sort |
marshall parameters for quality control of hot mix asphalt after pavement construction |
publisher |
Escuela de Construcción Civil, Pontificia Universidad Católica de Chile |
publishDate |
2019 |
url |
http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000100178 |
work_keys_str_mv |
AT bojorqueineguezjaime marshallparametersforqualitycontrolofhotmixasphaltafterpavementconstruction AT florescristian marshallparametersforqualitycontrolofhotmixasphaltafterpavementconstruction AT vasquezmario marshallparametersforqualitycontrolofhotmixasphaltafterpavementconstruction |
_version_ |
1714206297604227072 |