Time-cost optimization using harmony search algorithm in construction projects
Abstract In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project du...
Guardado en:
Autores principales: | , , |
---|---|
Lenguaje: | English |
Publicado: |
Escuela de Construcción Civil, Pontificia Universidad Católica de Chile
2019
|
Materias: | |
Acceso en línea: | http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000200226 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
id |
oai:scielo:S0718-915X2019000200226 |
---|---|
record_format |
dspace |
spelling |
oai:scielo:S0718-915X20190002002262019-10-07Time-cost optimization using harmony search algorithm in construction projectsZalmai),Mohammad LemarAkcay,CemilManisali,Ekrem Construction sector CPM (Critical Path Method) multi-objective optimization harmony search method time-cost trade-off Abstract In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project duration considering the completion time and cost of the activities so that the most suitable construction schedule is prepared by providing a trade-off between project duration and total cost. In the case of time-cost trade-off problems, the total cost of the project is determined by summing each activities’ cost by adding indirect costs. Moreover, total project duration is determined by obtaining total project duration after CPM (Critical Path Method) calculations. Obtaining optimum duration and costs is such a problematic issue with using conventional methods and common software packages. These techniques consider deterministic project values and include CPM calculations for fitness value calculation. Moreover, current studies defined alternatives as non-variable discrete values. However, construction projects are dynamic processes, and quantities are prone to be changed related to project size. In this study, time-cost trade-off optimization is performed by using harmony search method with introducing different implementation that can be more easily used for different projects. The model is implemented in a real construction project, and the conclusions are interpreted.info:eu-repo/semantics/openAccessEscuela de Construcción Civil, Pontificia Universidad Católica de ChileRevista de la construcción v.18 n.2 20192019-07-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000200226en10.7764/rdlc.18.2.226 |
institution |
Scielo Chile |
collection |
Scielo Chile |
language |
English |
topic |
Construction sector CPM (Critical Path Method) multi-objective optimization harmony search method time-cost trade-off |
spellingShingle |
Construction sector CPM (Critical Path Method) multi-objective optimization harmony search method time-cost trade-off Zalmai),Mohammad Lemar Akcay,Cemil Manisali,Ekrem Time-cost optimization using harmony search algorithm in construction projects |
description |
Abstract In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project duration considering the completion time and cost of the activities so that the most suitable construction schedule is prepared by providing a trade-off between project duration and total cost. In the case of time-cost trade-off problems, the total cost of the project is determined by summing each activities’ cost by adding indirect costs. Moreover, total project duration is determined by obtaining total project duration after CPM (Critical Path Method) calculations. Obtaining optimum duration and costs is such a problematic issue with using conventional methods and common software packages. These techniques consider deterministic project values and include CPM calculations for fitness value calculation. Moreover, current studies defined alternatives as non-variable discrete values. However, construction projects are dynamic processes, and quantities are prone to be changed related to project size. In this study, time-cost trade-off optimization is performed by using harmony search method with introducing different implementation that can be more easily used for different projects. The model is implemented in a real construction project, and the conclusions are interpreted. |
author |
Zalmai),Mohammad Lemar Akcay,Cemil Manisali,Ekrem |
author_facet |
Zalmai),Mohammad Lemar Akcay,Cemil Manisali,Ekrem |
author_sort |
Zalmai),Mohammad Lemar |
title |
Time-cost optimization using harmony search algorithm in construction projects |
title_short |
Time-cost optimization using harmony search algorithm in construction projects |
title_full |
Time-cost optimization using harmony search algorithm in construction projects |
title_fullStr |
Time-cost optimization using harmony search algorithm in construction projects |
title_full_unstemmed |
Time-cost optimization using harmony search algorithm in construction projects |
title_sort |
time-cost optimization using harmony search algorithm in construction projects |
publisher |
Escuela de Construcción Civil, Pontificia Universidad Católica de Chile |
publishDate |
2019 |
url |
http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000200226 |
work_keys_str_mv |
AT zalmaimohammadlemar timecostoptimizationusingharmonysearchalgorithminconstructionprojects AT akcaycemil timecostoptimizationusingharmonysearchalgorithminconstructionprojects AT manisaliekrem timecostoptimizationusingharmonysearchalgorithminconstructionprojects |
_version_ |
1714206298263781376 |