Time-cost optimization using harmony search algorithm in construction projects

Abstract In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project du...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Zalmai),Mohammad Lemar, Akcay,Cemil, Manisali,Ekrem
Lenguaje:English
Publicado: Escuela de Construcción Civil, Pontificia Universidad Católica de Chile 2019
Materias:
Acceso en línea:http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000200226
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:scielo:S0718-915X2019000200226
record_format dspace
spelling oai:scielo:S0718-915X20190002002262019-10-07Time-cost optimization using harmony search algorithm in construction projectsZalmai),Mohammad LemarAkcay,CemilManisali,Ekrem Construction sector CPM (Critical Path Method) multi-objective optimization harmony search method time-cost trade-off Abstract In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project duration considering the completion time and cost of the activities so that the most suitable construction schedule is prepared by providing a trade-off between project duration and total cost. In the case of time-cost trade-off problems, the total cost of the project is determined by summing each activities’ cost by adding indirect costs. Moreover, total project duration is determined by obtaining total project duration after CPM (Critical Path Method) calculations. Obtaining optimum duration and costs is such a problematic issue with using conventional methods and common software packages. These techniques consider deterministic project values and include CPM calculations for fitness value calculation. Moreover, current studies defined alternatives as non-variable discrete values. However, construction projects are dynamic processes, and quantities are prone to be changed related to project size. In this study, time-cost trade-off optimization is performed by using harmony search method with introducing different implementation that can be more easily used for different projects. The model is implemented in a real construction project, and the conclusions are interpreted.info:eu-repo/semantics/openAccessEscuela de Construcción Civil, Pontificia Universidad Católica de ChileRevista de la construcción v.18 n.2 20192019-07-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000200226en10.7764/rdlc.18.2.226
institution Scielo Chile
collection Scielo Chile
language English
topic Construction sector
CPM (Critical Path Method)
multi-objective optimization
harmony search method
time-cost trade-off
spellingShingle Construction sector
CPM (Critical Path Method)
multi-objective optimization
harmony search method
time-cost trade-off
Zalmai),Mohammad Lemar
Akcay,Cemil
Manisali,Ekrem
Time-cost optimization using harmony search algorithm in construction projects
description Abstract In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project duration considering the completion time and cost of the activities so that the most suitable construction schedule is prepared by providing a trade-off between project duration and total cost. In the case of time-cost trade-off problems, the total cost of the project is determined by summing each activities’ cost by adding indirect costs. Moreover, total project duration is determined by obtaining total project duration after CPM (Critical Path Method) calculations. Obtaining optimum duration and costs is such a problematic issue with using conventional methods and common software packages. These techniques consider deterministic project values and include CPM calculations for fitness value calculation. Moreover, current studies defined alternatives as non-variable discrete values. However, construction projects are dynamic processes, and quantities are prone to be changed related to project size. In this study, time-cost trade-off optimization is performed by using harmony search method with introducing different implementation that can be more easily used for different projects. The model is implemented in a real construction project, and the conclusions are interpreted.
author Zalmai),Mohammad Lemar
Akcay,Cemil
Manisali,Ekrem
author_facet Zalmai),Mohammad Lemar
Akcay,Cemil
Manisali,Ekrem
author_sort Zalmai),Mohammad Lemar
title Time-cost optimization using harmony search algorithm in construction projects
title_short Time-cost optimization using harmony search algorithm in construction projects
title_full Time-cost optimization using harmony search algorithm in construction projects
title_fullStr Time-cost optimization using harmony search algorithm in construction projects
title_full_unstemmed Time-cost optimization using harmony search algorithm in construction projects
title_sort time-cost optimization using harmony search algorithm in construction projects
publisher Escuela de Construcción Civil, Pontificia Universidad Católica de Chile
publishDate 2019
url http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000200226
work_keys_str_mv AT zalmaimohammadlemar timecostoptimizationusingharmonysearchalgorithminconstructionprojects
AT akcaycemil timecostoptimizationusingharmonysearchalgorithminconstructionprojects
AT manisaliekrem timecostoptimizationusingharmonysearchalgorithminconstructionprojects
_version_ 1714206298263781376