Allocation of bridge maintenance costs based on prioritization indexes

Abstract Prioritization indexes (PI) are a need-based bridge maintenance approach, which allows making short-term maintenance decisions. They generally use just the bridge condition as an explanatory variable, therefore, prioritizing is easy to do. When these indexes are multidimensional, prioritiza...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Echaveguren,Tomás, Dechent,Peter
Lenguaje:English
Publicado: Escuela de Construcción Civil, Pontificia Universidad Católica de Chile 2019
Materias:
Acceso en línea:http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000300568
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:scielo:S0718-915X2019000300568
record_format dspace
spelling oai:scielo:S0718-915X20190003005682020-02-04Allocation of bridge maintenance costs based on prioritization indexesEchaveguren,TomásDechent,Peter Bridge maintenance maintenance costs prioritization index condition index strategic importance hydraulic and seismic vulnerability Abstract Prioritization indexes (PI) are a need-based bridge maintenance approach, which allows making short-term maintenance decisions. They generally use just the bridge condition as an explanatory variable, therefore, prioritizing is easy to do. When these indexes are multidimensional, prioritization depends not just on the bridge conditions, but also on variables such as vulnerability and their strategic importance. This paper discusses a simple and direct procedure to allocate bridge maintenance costs by using a PI based on the bridge condition, their strategic importance and vulnerability. The procedure combines maintenance activities within the strategies of routine and preventive maintenance, repair, reinforcement, reconstruction or replacement. It includes the calculation of maintenance costs by maintenance activity and strategy, in order to integrate them in a cost matrix. The procedure is applied to a 24-m long bridge, whose infrastructure is made of concrete, steel beams and concrete deck. Unit costs of 60 maintenance activities were calculated, and a sensitivity analysis was carried out to establish the cost by linear meter in relation to PI explanatory variables. The cost was sensitive to bridge condition, their vulnerability, and relevance within the road network.info:eu-repo/semantics/openAccessEscuela de Construcción Civil, Pontificia Universidad Católica de ChileRevista de la construcción v.18 n.3 20192019-12-01text/htmlhttp://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000300568en10.7764/rdlc.18.3.568
institution Scielo Chile
collection Scielo Chile
language English
topic Bridge maintenance
maintenance costs
prioritization index
condition index
strategic importance
hydraulic and seismic vulnerability
spellingShingle Bridge maintenance
maintenance costs
prioritization index
condition index
strategic importance
hydraulic and seismic vulnerability
Echaveguren,Tomás
Dechent,Peter
Allocation of bridge maintenance costs based on prioritization indexes
description Abstract Prioritization indexes (PI) are a need-based bridge maintenance approach, which allows making short-term maintenance decisions. They generally use just the bridge condition as an explanatory variable, therefore, prioritizing is easy to do. When these indexes are multidimensional, prioritization depends not just on the bridge conditions, but also on variables such as vulnerability and their strategic importance. This paper discusses a simple and direct procedure to allocate bridge maintenance costs by using a PI based on the bridge condition, their strategic importance and vulnerability. The procedure combines maintenance activities within the strategies of routine and preventive maintenance, repair, reinforcement, reconstruction or replacement. It includes the calculation of maintenance costs by maintenance activity and strategy, in order to integrate them in a cost matrix. The procedure is applied to a 24-m long bridge, whose infrastructure is made of concrete, steel beams and concrete deck. Unit costs of 60 maintenance activities were calculated, and a sensitivity analysis was carried out to establish the cost by linear meter in relation to PI explanatory variables. The cost was sensitive to bridge condition, their vulnerability, and relevance within the road network.
author Echaveguren,Tomás
Dechent,Peter
author_facet Echaveguren,Tomás
Dechent,Peter
author_sort Echaveguren,Tomás
title Allocation of bridge maintenance costs based on prioritization indexes
title_short Allocation of bridge maintenance costs based on prioritization indexes
title_full Allocation of bridge maintenance costs based on prioritization indexes
title_fullStr Allocation of bridge maintenance costs based on prioritization indexes
title_full_unstemmed Allocation of bridge maintenance costs based on prioritization indexes
title_sort allocation of bridge maintenance costs based on prioritization indexes
publisher Escuela de Construcción Civil, Pontificia Universidad Católica de Chile
publishDate 2019
url http://www.scielo.cl/scielo.php?script=sci_arttext&pid=S0718-915X2019000300568
work_keys_str_mv AT echavegurentomas allocationofbridgemaintenancecostsbasedonprioritizationindexes
AT dechentpeter allocationofbridgemaintenancecostsbasedonprioritizationindexes
_version_ 1714206303046336512