ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION

This research work presents the reliability assessment of electrical load distribution system in Federal University of Petroleum Resources, Effurun (FUPRE), Warri using the Analytical method and ETAP software as the simulation tool to run the reliability assessment of the System. The analytical ana...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: AMAKIRI OKILO FRIDAY, OSHEVIRE PATRICK
Formato: article
Lenguaje:EN
Publicado: Alma Mater Publishing House "Vasile Alecsandri" University of Bacau 2020
Materias:
T
Acceso en línea:https://doaj.org/article/08da2155cf804d43abf454917680cdee
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
id oai:doaj.org-article:08da2155cf804d43abf454917680cdee
record_format dspace
spelling oai:doaj.org-article:08da2155cf804d43abf454917680cdee2021-12-02T19:52:42ZELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION10.29081/jesr.v26i3.2052068-75592344-4932https://doaj.org/article/08da2155cf804d43abf454917680cdee2020-07-01T00:00:00Zhttp://www.jesr.ub.ro/1/article/view/205https://doaj.org/toc/2068-7559https://doaj.org/toc/2344-4932 This research work presents the reliability assessment of electrical load distribution system in Federal University of Petroleum Resources, Effurun (FUPRE), Warri using the Analytical method and ETAP software as the simulation tool to run the reliability assessment of the System. The analytical analysis was conceded out by using August 2018 – August 2019 historical data of Tetfund Classrooms Blocks, Hostels, College of Technology, Administration Block, Health Center, and College of Science Feeder obtained from the Benin Electricity Distribution Company [BEDC]. The results conceded revealed that College of Technology Injection Substation is the most reliable in the distribution network when compared to the other five substations around the institution premises as it recorded system indices of ASAI: 99.30, SAIFI: 1.10, SAIDI: 55.35, CAIDI: 123.04 in August 2018 to August 2019. Nevertheless, the total reliability indices of the six substations under investigation as obtained from the analysis, and it shows that availability of power to FUPRE distribution is very poor as compared with the benchmark of IEEE ASAI of 99.99 for distribution substation availability. AMAKIRI OKILO FRIDAYOSHEVIRE PATRICKAlma Mater Publishing House "Vasile Alecsandri" University of Bacauarticlereliability assessment, availability of power, distribution system, reliability indices, load point indices, system indices and ETAPTechnologyTEngineering (General). Civil engineering (General)TA1-2040ENJournal of Engineering Studies and Research, Vol 26, Iss 3 (2020)
institution DOAJ
collection DOAJ
language EN
topic reliability assessment, availability of power, distribution system, reliability indices, load point indices, system indices and ETAP
Technology
T
Engineering (General). Civil engineering (General)
TA1-2040
spellingShingle reliability assessment, availability of power, distribution system, reliability indices, load point indices, system indices and ETAP
Technology
T
Engineering (General). Civil engineering (General)
TA1-2040
AMAKIRI OKILO FRIDAY
OSHEVIRE PATRICK
ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
description This research work presents the reliability assessment of electrical load distribution system in Federal University of Petroleum Resources, Effurun (FUPRE), Warri using the Analytical method and ETAP software as the simulation tool to run the reliability assessment of the System. The analytical analysis was conceded out by using August 2018 – August 2019 historical data of Tetfund Classrooms Blocks, Hostels, College of Technology, Administration Block, Health Center, and College of Science Feeder obtained from the Benin Electricity Distribution Company [BEDC]. The results conceded revealed that College of Technology Injection Substation is the most reliable in the distribution network when compared to the other five substations around the institution premises as it recorded system indices of ASAI: 99.30, SAIFI: 1.10, SAIDI: 55.35, CAIDI: 123.04 in August 2018 to August 2019. Nevertheless, the total reliability indices of the six substations under investigation as obtained from the analysis, and it shows that availability of power to FUPRE distribution is very poor as compared with the benchmark of IEEE ASAI of 99.99 for distribution substation availability.
format article
author AMAKIRI OKILO FRIDAY
OSHEVIRE PATRICK
author_facet AMAKIRI OKILO FRIDAY
OSHEVIRE PATRICK
author_sort AMAKIRI OKILO FRIDAY
title ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_short ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_full ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_fullStr ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_full_unstemmed ELECTRICAL LOAD RELIABILITY ASSESSMENT USING ANALYTICAL METHOD, CASE STUDY: FUPRE 1 X 2.5MVA INJECTION SUBSTATION
title_sort electrical load reliability assessment using analytical method, case study: fupre 1 x 2.5mva injection substation
publisher Alma Mater Publishing House "Vasile Alecsandri" University of Bacau
publishDate 2020
url https://doaj.org/article/08da2155cf804d43abf454917680cdee
work_keys_str_mv AT amakiriokilofriday electricalloadreliabilityassessmentusinganalyticalmethodcasestudyfupre1x25mvainjectionsubstation
AT oshevirepatrick electricalloadreliabilityassessmentusinganalyticalmethodcasestudyfupre1x25mvainjectionsubstation
_version_ 1718375882023763968